Momed80

Sharing
Joined
Likes
151
Gallons
35,046

Snorkel Scissor Lifts S3215L Parts Manual 1502782 2017

#1
Download this document, you need 1050 Gallons
Download Now
Snorkel Scissor Lifts S3215L Parts Manual 1502782 2017
Size: 91.72 MB
Format: PDF
Language: English
Brand: Snorkel
Type of Machine: Scissor Lift
Type of Manual: Parts Manual, Electrical Diagram, Hydraulic Diagram
Model: Snorkel S3215L Scissor Lift
Serial Number: 000000 and after
Part Number: 1502782
Publication Date: 2017
Number of Pages: 503 Pages

Contents:
General Information
General Information
Repair Parts
Chassis Assembly - August 2018 And Before
Chassis Assembly - September 2018 And After
Chassis Weldment Bearings
Chassis Stack Assembly - April 2017 And Before
Chassis Stack Assembly - May 2017 And After
Chassis Stack Assembly - August 2019 And After
Chassis Stack Assembly - December 2017 And After
Chassis Stack Assembly - October 2018 And After
Assembly - Ansi
Rear Tray Assembly - Ansi - Sn 3219e-04-002295 And Before
Rear Tray Assembly - Service Use 150198428 For Chassis Harness - Ansi
Rear Tray Assembly - Ansi - S3219e-04-S3219e-04-181006662 And Before
Rear Tray Assembly - Ansi - S3219e-04-181006663 And After
Rear Tray Assembly - Ansi - S3215e/S3215l/S3219e - September 2018 And After
Rear Tray Assembly - Ansi - S3215l/S3215e/S3219e-04-190407733 And After
Rear Tray Assembly - January 2019 And After
Rear Tray Assembly - Ce/As - February 2019 And After
Rear Tray Assembly - April 2019 And After
Valve Tray Assembly Two-Speed - October 2018 And Before
Valve Tray Assembly Two-Speed - December 2019 And After
Valve Tray Assembly Two-Speed - Ansi/Ce - Sn 3219e-04-002296 Through Current
Valve Tray Assembly Wide - October 2020 And After
Assembly - Ce/As
Assembly - Ce/As - September 2019 And Before
Assembly - Ce/As - October 2019 And After
Assembly - S3215e/S3215l/S3219e - Ansi/Csa - January 2020 And After
Assembly - S3215e/S3219e - Ansi 92.20/Csa - June 2020/A92.20 And After
Control Tray Assembly - S3215e/S3219e - As/Ce - October 2016 And After
Control Tray Assembly - S3215l/S3215e/S3219e - Ce - December 2017 And Before And Before
Control Tray Assembly - S3215l/S3215e/S3219e - As/Ce - October 2018 And After
Control Tray Assembly - S3215l/S3215e/S3219e - As/Ce - April 2019 And After
Control Tray Assembly - S3215e/S3219e - Ansi 92.20/Csa - January 2022 And After
Lynch Pin With Lanyard Assembly
Tray Installation - December 2018 And After
Tray Installation - November 2018 And Before
Tank Tray Assembly - S3215e/S3215l/S3219e - December 2017 And Before
Tank Tray Assembly - S3215e/S3215l/S3219e - June 2018 And After
Stack Installation - April 2019 And After
Stack Assembly - February 2016 And After
Stack Assembly - April 2019 And After
Folding Handrails Foot Latch Assembly - S3215e/S3219e - August 2019 And After
Folding Handrail Fixed Upper Control Box Assembly - Csa - September 2019 And After
Non-Folding Handrails Assembly - S3215e/S3215l/S3219e - April 2018 And Before - Ansi
Non-Folding Handrails Assembly - S3215l/S3215e/S3219e - May 2018 And After - Ansi
Handrail Assembly Fixed Upper Control Box - Ansi - April 2018 And Before
Handrails Assembly - May 2017 And After
Handrails Assembly - January 2018 And After
Handrails Assembly - S3215e/S3215l/S3219e - Ce - December 2018 And After
Handrails Assembly - Ce - June 2019 And Before
Handrails Assembly - May 2018 And After
Handrails Assembly - November 2019 And After
Handrail Assembly - Ce - July 2019 And After
Platform Assembly
Single Gate Assembly - S3215e/S3215l/S3219e - Ce - Feburary 2018 And Before
Single Gate Assembly - S3215e/S3219e/S3215l - Ce - March 2018 And After
Single Gate As Assembly - S3215e/S3215l/S3219e - December 2018 And After
Single Swing Gate Assembly - S3215e/S3215l/S3219e - Ce - December 2018 And After
Single Swing Gate Assembly - S3215e/S3219e - As
Saloon Gates Assembly - S3215e/S3215l/S3219e - Ce - November 2018 And Before
Saloon Gates Assembly - S3215e/S3215l/S3219e - Ce - December 2018 And After
Saloon Gates Assembly - S3215e/S3215l/S3219e - Ansi
Saloon Gates Assembly - November 2019 And After
Joystick Controller
Decal Assembly - Ce - September 2019 And Before
Decal Assembly - September 2019 And Before - German
Decal Assembly - Csa - September 2019 And Before
Decal Assembly - September 2019 And Before - French
Decal Assembly - Ce - October 2019 And After
Decal Assembly - Csa - October 2019 And After - French
Decal Assembly - October 2019 And After - German
Decal Assembly - Csa - October 2019 And After
Decal Assembly - Ansi - May 2020 And Before
Decals Assembly - Ansi 92.20/Csa - June 2020/A92.20 And After
Decal Assembly - As/Ce
Decals Assembly - Ce - French
Decals Assembly - Ansi 92.20/Csa - French
Hydraulics
Scissor Manifold Two-Speed Assembly - Fluid Tech
Manifold Two-Speed - November 2016 And Before
Manifold Two-Speed - December 2016 And After
Pump Unit 24vdc 4.33cc - November 2015 And After
Motor 230cc Dali - S3215/S3219 - After S3219-04-002035
Brake Dali - Sn S3219e-04-002034/S4732e-04-000561 And After
Hose Assembly
Lift Cylinder - September 2017 And After - Hengli
Lift Cylinder - After September 2017 - Rosenboom
Lift Cylinder - August 2017 And Before - Fisher
Steer Cylinder - Rosenboom/Pb
Electrical
Chassis Harness - Ansi - S3219e-04-002296 And After
Chassis Harness - Ansi - S3215e/S3215l/S3219e -March 2019 And Before
Chassis Harness - Ansi/Ce/As - Sn 3215e/S3219e/S3219e-04-190407733 Through Current
Angle Transducer Jumper - January 2019 And After
Tabulated Battery Cables
Lower Control Panel Assemblys - 3215e/S3215l/S3219e - Ansi - April 2016 And - After S4740 Feburary 2020 And After
Lower Control Panel Assembly - Ansi 92.20/Csa/Ce/As
Lower Control Harness
Wiring Box Panel Sub-Assembly - January 2005 And After
Wiring Box Panel - December 2015 And Before
Stack Harness Assembly - July 2018 And Before
Stack Harness
Bumpguard Assembly - S3215e/S3219e - September 2019 And After
Harness - 110v Jumper
Upper Control Box Assembly - Two-Speed - Ansi/Ce
Upper Control Box Harness - August 2016 And After
Upper Control Box Assembly - Two-Speed - Ansi - May 2017 And After
Upper Control Box Assembly - One-Speed - Ansi - June 2017 And Before
Upper Control Box Assembly - One-Speed - Ansi - July 2017 And After
Upper Control Box Assembly - Two-Speed - Ansi - May 2018 And After
Upper Control Box Assembly - Two-Speed - Ce - July 2018 And After
Upper Control Box Assembly - One-Speed - Ce - July 2018 And After
Upper Control Box Assembly With Snorkel Guard - Ce - October 2018 And After
Upper Control Box Assembly One-Speed - Ansi - S3215e/S3215l/S3219e - August 2018 And Before
Upper Control Box Assembly - Two-Speed - Ansi - September 2018 And Before
Upper Control Box Assembly - Two-Speed - Ansi - October 2018 And After
Upper Control Box Connection - Two-Speed - Ce - October 2018 And After
Upper Control Box Connector - Two-Speed - Ansi
Drive Control Pendant
110v Assembly - April 2017 And After
Resistor Array Harness Installation - 336 Ohms
Resistor Array Harness
Options
Maintenance Free Battery
Maintenance Free Battery
Maintenance Free Battery
Lithium Batteries Installation - 3
Trackunit/Keypad Installation
Trackunit With Keypad
Trackunit Access Connector - S3215l/S3215e/S3219e
Charger Interlock Delete - Ansi
24v Lithium Batteries Installation - 2
Connector Charger Interlock Delete
Locking Battery And Rear Tray
Rear Tray Cover Installation
Plug - Australia/New Zealand
Inverter Assembly
Airline
Handrails Removable Upper Control Box Assembly - Ce - November 2020 And After
Folding Handrails - Fixed Upper Control Box Foot Latch - Ce - S3215e/S3219e - May 2019 And After
Non-Folding Handrails Assembly With Foot Latch
Removable Top Rail - S3215e/S3215l/S3219e/S3220e/S3226e
Control Box Weather Guard Kit
Snorkel Guard Assembly - Non-Removable 6-Pin - Ansi 92.20/Csa
Snorkel Guard - Removable 8-Pin - Ce/As
Snorkel Guard - Removable 8-Pin - Ansi 92.20/Csa
Snorkel Guard Assembly - Non-Removable 6-Pin - Ce/As
Snorkel Guard Platform Control Box Two-Speed Assembly - Ansi - August 2018 And After
Snorkel Guard Upper Control Box Harness
Upper Control Box With Snorkel Guard Assembly - Ce/As
Upper Control Box Assembly With Snorkel Guard
Gravity Gate Assembly - S3215e/S3219e
6h Plug And Socket
110v Assembly - April 2017 And After
Inverter Assembly - S3215l/S3215e/S3219e
Panel Carrier
Panel Carrier
Pipe Rack Narrow
Environmentally Safe Oil - S3215e/S3215l/S3219e
Step Platform Assembly - 22.5" Wide - Fits: 30"/32"/47" Wide Platforms
Step Platform Assembly - 23.75" Wide
Padded Rail Narrow
Amber Beacon Installation - Ce - October 2016 And After
Amber Beacon Installation - Ansi - June 2019 And After
Amber Beacon Assembly - Ansi
Amber Beacon Assembly - Ansi/Ce/As - October 2016 And After
Amber Beacon Harness
Dual Flashing Light
Safety Zone Light
Blue Safety Light Assembly
Red Safety Light Assembly
Schematics
Two-Speed Hydraulic Schematic - S3215l/S3215e S3219e/S3220e/S3226e/S4726e/S4732e - March 22, 2017 And After
Hydraulic Schematic Uses - S3215l/S3215e/S3219e/S3220e/S3226e/S4726e/S4732e
Electrical Schematic Without Pendant - Ansi - S3215l/S3215/S3219e/S3220e/S3226e/S4726e/S4732e
Electrical Schematic - S3215l/S3215e/S3219e/S3220e/S3226e/S4726e/S4732e - Ce
Electrical Schematic With Pendant - Ansi - S3215l/S3215e/S3219e/S3220e/S3226e/S4726e/S4732e
Electrical Schematic Telematics
Appendix A:pages Index
Appendix B:parts Index





 
Top