JLG Boom Lift 1200SJP, 1350SJP Service & Maintenance Manual 31225622 2026
- Download this document, you need 2725 Gallons
JLG Boom Lift 1200SJP, 1350SJP Service & Maintenance Manual 31225622 2026
Size: 83.77 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1200SJP, 1350SJP Boom Lift
Part Number: 31225622
Publication Date: 2026
Number of Pages: 894 Pages
Contents:
Safety
Size: 83.77 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1200SJP, 1350SJP Boom Lift
Part Number: 31225622
Publication Date: 2026
Number of Pages: 894 Pages
Contents:
Safety
General
1.1.1 Disclaimer
1.1.2 Operation & Safety Manual
Safety Information
1.2.1 Safety Alert System and Signal Words
Safety Hazards
1.3.1 Personal Hazards
1.3.2 Equipment Hazards
1.3.3 General Hazards
1.3.4 Operational Hazards
Safety Decals
Machine Verification
General Machine Information and SpecificationsSpecifications
2.1.1 Machine Specifications
2.1.2 Machine Dimensional Data
2.1.3 Engine Data
2.1.4 Tires
2.1.5 Chassis Specifications
2.1.6 Major Component Weights
2.1.7 Torque Requirements
2.1.8 Pressure Settings
Machine Temperature Chart
Serial Number Location
Fluids and Lubrication
2.4.1 Hydraulic System
2.4.2 Hydraulic Oil
2.4.3 Changing Hydraulic Oil
2.4.4 Lubrication Specifications
2.4.5 Fluids
2.4.6 Capacities
2.4.7 Lubrication Schedule
Machine Characteristics
2.5.1 Axle Extension System
2.5.2 Drive System
2.5.3 Steering Control System
2.5.4 Drive/Steering Speed Control
2.5.5 Traction Control System
2.5.6 Drive Orientation System
2.5.7 Oscillating Axle System
2.5.8 Swing Speed Proportioning
2.5.9 Chassis Tilt Indicator System
2.5.10 Auxiliary Power System
2.5.11 HRC Engine Emission Characteristics
2.5.12 Diesel Particulate Filter (If Equipped)
2.5.13 Broken Cable Indicator System
2.5.14 Platform Control Enable System
2.5.15 Transport Position Sensing System
2.5.16 Beyond Transport - Drive Speed Cutback System
2.5.17 Drive/Steer – Boom Function Interlock System (CE/UKCA ONLY)
2.5.18 Jib Stow System
2.5.19 Envelope Tracking System
2.5.20 Moment Control System
2.5.21 Boom Control System (BCS) Functional Check (Push to Test) System
2.5.22 Controlled Arc System
2.5.23 Controlled Boom Angle System
2.5.24 Envelope Tracking
2.5.25 Slow Down System
2.5.26 Dual Capacity System
2.5.27 Platform Load Sensing System (LSS)
2.5.28 Electronic Platform Leveling
2.5.29 Boom Control Select
2.5.30 Electronic Platform Leveling
2.5.31 Normal Operation
Clearsky Smart Fleet (If Equipped)
2.6.1 General
2.6.2 ClearSky Smart Fleet™ — Access Control
Maintenance and Inspection SchedulesMachine Preparation, Inspection, and Maintenance
3.1.1 General
3.1.2 Preparation, Inspection, and Maintenance
3.1.3 Pre-Start Inspection
3.1.4 Pre-Delivery Inspection and Frequent Inspection
3.1.5 Annual Machine Inspection
3.1.6 Preventive Maintenance
Service and Guidelines
3.2.1 General
3.2.2 Safety and Workmanship
3.2.3 Cleanliness
3.2.4 Components Removal and Installation
3.2.5 Component Disassembly and Reassembly
3.2.6 Pressure-Fit Parts
3.2.7 Bearings
3.2.8 Gaskets
3.2.9 Bolt Usage and Torque Application
3.2.10 Hydraulic Lines and Electrical Wiring
3.2.11 Hydraulic System
3.2.12 Lubrication
3.2.13 Battery
3.2.14 Welding on JLG Equipment
Preventive Maintenance and Inspection Schedule
3.3.1 Daily
3.3.2 First 50 Hours
3.3.3 First 150 Hours
3.3.4 Every 150 Hours or 3 Months
3.3.5 Every 300 Hours or 6 Months
3.3.6 Every 500 Hours or 6 Months
3.3.7 Every 600 Hours or 1 Year
3.3.8 Every 1000 hours or 2 years
3.3.9 Every 1200 Hours or 2 Years
Pins and Composite Bearing Repair Guidelines
Tires and Wheels
3.5.1 Tire Inflation
3.5.2 Tire Damage
Fuel Tank Inspection
Boom Inspection and Maintenance
3.7.1 Wire Rope Tensioning Adjustment
3.7.2 Wire Rope Tensioning Procedure
3.7.3 Wire Rope
3.7.4 Boom Cleanliness Guidelines
3.7.5 Boom Wear Pad Inspection
Hydraulic Filter Replacement
3.8.1 Hydraulic Filter Removal
3.8.2 Hydraulic Filter Installation
Turntable Bearing Inspection
3.9.1 Turntable Bearing Mounting Bolt Condition Check
3.9.2 Wear Tolerance
Engine General Inspection
3.10.1 General Maintenance
3.10.2 Deutz TD2.9L4 and Deutz TCD2.9L4 (China IV) Engine
3.10.3 Deutz Engine TCD2.9L4 (T4F and Stage V)
Bio Fuel In Deutz Engines
3.11.1 General
3.11.2 Bio Fuel
3.11.3 Biological Contamination In Fuels
Deutz EMR5
Generator Inspection
3.13.1 Every 250 hours
3.13.2 Every 500 hours
3.13.3 Overload Protection
3.13.4 Inspecting Brushes, Replacing Brushes, and Cleaning Slip Rings
Testing, Calibrations and Special ProceduresSpecial Tools
4.1.1 Multimeter
4.1.2 Threadlocking Compound
4.1.3 Tools Catalog
Testing Procedures
4.2.1 Starter
4.2.2 SkyGuard
4.2.3 LSS Testing and Evaluation
4.2.4 System Test
Calibration Procedures
4.3.1 JLG Analyzer
4.3.2 Calibration Preparation
4.3.3 Load Sensing System Calibration
4.3.4 Calibrating Tilt Sensor
4.3.5 Calibrating Platform Level
4.3.6 Calibrating Lift Crack Point
4.3.7 Calibrating Telescope Crack point
4.3.8 Calibrating the Boom Sensors
4.3.9 Calibrating Steer
4.3.10 Calibrating Drive
Special Procedures
4.4.1 Drive Cutout Override Service Mode
4.4.2 Fuel Tank Cleaning and Drying
4.4.3 Cylinder Drift
4.4.4 Oscillating Axle Bleeding Procedure and Lockout Test
4.4.5 Axle Limit Switch Adjustment Procedure
System SoftwareLoad Sensing System (LSS)
5.1.1 Theory of Operation
5.1.2 Load Sensing Gauge Removal/ Installation
5.1.3 Diagnostic Menu
JLG Analyzer
5.2.1 Introduction
5.2.2 Hand Held Analyzer
5.2.3 To Connect the JLG Control System Analyzer
5.2.4 Using the Analyzer
5.2.5 Changing the Access Level Of The Hand Held Analyzer
5.2.6 Adjusting Parameters Using The Hand Held Analyzer
5.2.7 Machine Setup
5.2.8 Analyzer Flow Chart
Analyzer Software Accessibility
5.3.1 Machine Set-Up
5.3.2 Machine Personality Settings/Function Speeds
Function Test
5.4.1 Machine Orientation When Setting Function Speeds
CANbus Communications (reference)
5.5.1 CANbus Communication Failure
Service Mode
5.6.1 Load Sensing System
5.6.2 Drive Cutout Override
Electronic Platform Leveling
5.7.1 Platform Leveling Fault Warning
5.7.2 Fault Response
5.7.3 CAN Errors
5.7.4 Additional Platform and Jib Valves
5.7.5 Platform Leveling Calibration Procedure
ClearSky (CS550) Configuration and Troubleshooting
5.8.1 ClearSky Smart FleetTM CS550 Configuration
5.8.2 Troubleshooting
Fault CodesFault Codes Introduction
Machine Fault Codes
6.2.1 General
6.2.2 ClearSky Smart Fleet DTC Fault Codes
ClearSky CS550 Troubleshooting Procedures
Machine Diagnostics Parameters
Deutz EMR Fault Codes
6.5.1 EMR5 Fault Codes
HydraulicsGeneral Information and Safety
Theories of Operation
7.2.1 Cylinders
7.2.2 Valves
Hydraulic Components
7.3.1 Hydraulic Oil Tank
7.3.2 Lubricating O-rings In The Hydraulic System
7.3.3 Pressure Setting Procedure
7.3.4 Set Up of the Function Pump
7.3.5 Adjustments Made at the Main Valve Bank
7.3.6 Adjustments Made at the Frame Valve Bank
7.3.7 Adjustments Made at the Platform Valve Bank
7.3.8 Drive & Function Pump Start Up Procedures
Torque Values
Standard Hydraulic Diagram- Boom And Turntable
7.5.1 Boom
7.5.2 Turntable (with Rexroth Pump)
7.5.3 Turntable (with Sauer Pump)
Hydraulic Diagram - Chassis
7.6.1 4WD Chassis (with Rexroth Pump)
7.6.2 4WD Chassis (with Sauer Pump)
7.6.3 Oscillating Axle
7.6.4 Axle Extend and Steer
ElectricalsGeneral Information
8.1.1 Applying Silicone Dielectric Compound to Electrical Connections
8.1.2 Dielectric Grease Application
Electrical Connectors
8.2.1 Deutsch Connectors
Electrical Component Terminology
Harness Layouts
Board Layouts
AMP Connector
8.6.1 Applying Silicone Dielectric Compound to AMP Connectors
8.6.2 Assembly
8.6.3 Disassembly
8.6.4 Wedge Lock
8.6.5 Service - Voltage Reading
Wiring Harness and Connector Label Diagrams
Telematics Gateway
8.8.1 Telematics-Ready (TCU) Plug
Removal and InstallationWheel and Tire
Chassis/Frame Assembly
9.2.1 Chassis Component
9.2.2 Drive Hub
9.2.3 Drive Motor
9.2.4 Spindle
9.2.5 Axle
Boom
9.3.1 Boom Component
9.3.2 Boom Removal
9.3.3 Rotator
9.3.4 Load Sensing Pin Removal and Installation
9.3.5 Boom/Jib Sensors and Switches Installation
9.3.6 Adjusting the Proximity Switch
9.3.7 Hose Routing Procedure
Platform
9.4.1 Platform (Rapid Replaceable Platform)
9.4.2 Platform Support (Traditional Design)
9.4.3 Platform Support (Rapid Replaceable Platform)
9.4.4 Bolt-on External Fall Arrest
Engine
9.5.1 Component Terminology
9.5.2 Deutz TD2.9 L4 Engine
9.5.3 Deutz TCD2.9L4 Engine
9.5.4 Deutz TCD2.9L4 (Stage V) Engine
9.5.5 Deutz TCD2.9L4 (China IV) Engine
9.5.6 Engine Serial Number
9.5.7 Engine Replacement
9.5.8 Surge Tank
9.5.9 Pump Coupling Kit
9.5.10 Air Filter Assembly
9.5.11 Radiator Assembly
9.5.12 Thermostat
9.5.13 Coolant Temperature Sensor
9.5.14 Relay Assembly
9.5.15 Starter
9.5.16 Alternator
9.5.17 Fuel Tank
9.5.18 Pre- Fuel Filter and Fuel Pump
Transmission
Hydraulic Cylinders
9.7.1 Main Boom Lift Cylinder
9.7.2 Steer Cylinder
9.7.3 Axle Extend Cylinder
9.7.4 Axle Lockout Cylinder
Hydraulic Valves
9.8.1 Platform Control Valve (Rapid Replaceable)
9.8.2 Platform Valve (Traditional Design)
9.8.3 Main Control Valve
9.8.4 Traction Valve
9.8.5 Axle Extend and Steer Valve
Hydraulic Pumps
9.9.1 Charge Pump
9.9.2 Function Pump
9.9.3 Drive Pump
9.9.4 Rexroth Pump
Electrical Components
9.10.1 Battery
9.10.2 Cold Weather Package
Turntable
9.11.1 Swing Bearing
9.11.2 Swing Brake
9.11.3 Procedure for Setting Gear Backlash
9.11.4 Swing Drive Lubrication
9.11.5 Rotary Coupling
Generator Pulley
9.12.1 Removal
9.12.2 Installation
ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)
9.13.1 ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)
Disassembly and AssemblyDrive Assembly
10.1.1 Drive Hub - If Equipped With Reggiana Riduttori
10.1.2 Tools
10.1.3 Disassembly
10.1.4 Assembly
10.1.5 Drive Motor
Boom and Jib Assembly
10.2.1 Disassembly
10.2.2 Assembly
10.2.3 Boom Lubrication Application
10.2.4 Boom Shimming Procedure
10.2.5 Jib Rotator Orientation
10.2.6 Jib Lift End of Stroke Dampening
10.2.7 Required Tools
10.2.8 Rotary Actuator
Pumps
10.3.1 Drive Pumps (Rexroth)
10.3.2 Charge Pressure Relief Valve Adjustment
10.3.3 Mechanical Centering of Pump
10.3.4 Hydraulic Centering of Control Modules
10.3.5 High Pressure Relief Valve Adjustments
10.3.6 Removal and Inspection of Charge Pump
10.3.7 Routine Maintenance
10.3.8 Removal and Installation of Shaft Seal
10.3.9 Function Pump (Rexroth)
10.3.10 Spare Parts
10.3.11 Sealing the Drive Shaft
10.3.12 Disassembly and Assembly of the Complete Unit
10.3.13 Assembly
10.3.14 Adjustments
10.3.15 Tightening Torques
10.3.16 Pump Control Disassembly for Cleaning
10.3.17 Drive Pumps (SAUER)
10.3.18 Port Locations and Gauge Installation
10.3.19 Initial Startup Procedures
10.3.20 Troubleshooting
10.3.21 Adjustments
10.3.22 Removing the Pump
10.3.23 Inspection
10.3.24 Replacement
10.3.25 Electric Control Module
10.3.26 Shaft, Seal, and Bearing
10.3.27 Charge Pump
10.3.28 Charge Check / HPRV
10.3.29 Charge Pressure Relief Valve
10.3.30 Control Cutoff Valve
10.3.31 Function Pump (SAUER)
10.3.32 Inspection
10.3.33 Assembly
10.3.34 Charge pump (Sauer)
10.3.35 Assembly
10.3.36 Troubleshooting
Hydraulic Cylinders
10.4.1 Disassembly
10.4.2 Cleaning and Inspection
10.4.3 Assembly
10.4.4 Steer Cylinder
10.4.5 Cleaning And Inspection
10.4.6 Assembly
Turntable
10.5.1 Swing Drive Hub
10.5.2 Swing Drive
10.5.3 Swing Brake
10.5.4 Swing Motor
10.5.5 Rotary Coupling Seal Kit
Generator Disassembly and Assembly
10.6.1 Generator Disassembly and Assembly
Powertrack
10.7.1 One Piece Bracket Maintenance
10.7.2 Two Piece Bracket Maintenance
10.7.3 Snap Rings and Screws
Torque/Connection InformationHydraulic Fittings
11.1.1 Tapered Thread Types
11.1.2 Straight Thread Types, Tube and Hose Connections
11.1.3 Straight Thread Types, Port Connections
11.1.4 Flange Connection Types
11.1.5 Tightening Methods
11.1.6 Assembly and Torque Specifications
11.1.7 General Tube Type Fitting Assembly Instructions
11.1.8 Assembly Instructions for American Standard Pipe Thread Tapered Connections.
11.1.9 Assembly Instructions for British Standard Pipe Thread Tapered Connections
11.1.10 Assembly Instructions for 37° (JIC) Flare Fittings
11.1.11 Assembly Instructions for 45° SAE Flare Fittings
11.1.12 Assembly Instructions for O-Ring Face Seal (ORFS) Fittings
11.1.13 Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)
11.1.14 Assembly Instructions for Bulkhead (BH) Fittings
11.1.15 Assembly Instructions for O-Ring Boss (ORB) Fittings
11.1.16 Assembly Instructions for Adjustable Port End Metric Fittings
11.1.17 Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Ends
11.1.18 Assembly instructions for Adjustable Port End (BSPP) Fittings
11.1.19 Assembly Instructions for Flange Connections: (FL61 and FL62)
11.1.20 Double Wrench Method
11.1.21 FFWR and TFFT Methods
11.1.22 Adjustable Stud End Assembly
11.1.23 O-ring Installation (Replacement)
Torque Charts
11.2.1 SAE Fastener Torque Chart
11.2.2 Metric Fastener Torque Chart
SchematicsHydraulic Schematics
Electrical Schematics
Deutz EMR5 Schematics
Generator Schematics
12.4.1 Lead Connection List
More the random threads same category:
- Skytrak (JLG) Telehandlers Parts Manual
- SuperPac Parts Manual
- StratoLift Parts Manual
- JLG Toucan Duo 13MSPT Operators Service & Parts Manuals
- JLG Telehandler 1055 1255 (PVC 1911) Operation, Service & Parts Manuals
- JLG Scissor Lift RS Series Operation, Service & Parts Manuals
- JLG Telehandler G10-55A G12-55A Operation, Service & Parts Manuals
- JLG Telehandler 4017 Operation, Service & Parts Manuals
- JLG Telehandler 742 (PVC 1911) Operation, Service & Parts Manuals
- JLG Telehandler 3614RS 4017RS Operation, Service & Parts Manuals
- JLG UTV 315G Operator, Service & Parts Manuals
- JLG SkyTrak TeleHandler MMV Operation, Service & Parts Manuals
- JLG Scissor Lift R6 R10 Operation, Service & Parts Manuals
- JLG-Deutz Fahr Agrovector 40.8 40.9 Operators Service & Parts Manuals
- JLG Telehandler 925, 832 (PVC 1911) Operation, Service & Parts Manuals