Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Boom Lift 1200SJP, 1350SJP Service & Maintenance Manual 31225622 2026

#1
Download this document, you need 2725 Gallons
Download Now
JLG Boom Lift 1200SJP, 1350SJP Service & Maintenance Manual 31225622 2026
Size: 83.77 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1200SJP, 1350SJP Boom Lift
Part Number: 31225622
Publication Date: 2026
Number of Pages: 894 Pages

Contents:
Safety
General​
1.1.1 Disclaimer​
1.1.2 Operation & Safety Manual​
Safety Information​
1.2.1 Safety Alert System and Signal Words​
Safety Hazards​
1.3.1 Personal Hazards​
1.3.2 Equipment Hazards​
1.3.3 General Hazards​
1.3.4 Operational Hazards​
Safety Decals​
Machine Verification​
General Machine Information and Specifications
Specifications​
2.1.1 Machine Specifications​
2.1.2 Machine Dimensional Data​
2.1.3 Engine Data​
2.1.4 Tires​
2.1.5 Chassis Specifications​
2.1.6 Major Component Weights​
2.1.7 Torque Requirements​
2.1.8 Pressure Settings​
Machine Temperature Chart​
Serial Number Location​
Fluids and Lubrication​
2.4.1 Hydraulic System​
2.4.2 Hydraulic Oil​
2.4.3 Changing Hydraulic Oil​
2.4.4 Lubrication Specifications​
2.4.5 Fluids​
2.4.6 Capacities​
2.4.7 Lubrication Schedule​
Machine Characteristics​
2.5.1 Axle Extension System​
2.5.2 Drive System​
2.5.3 Steering Control System​
2.5.4 Drive/Steering Speed Control​
2.5.5 Traction Control System​
2.5.6 Drive Orientation System​
2.5.7 Oscillating Axle System​
2.5.8 Swing Speed Proportioning​
2.5.9 Chassis Tilt Indicator System​
2.5.10 Auxiliary Power System​
2.5.11 HRC Engine Emission Characteristics​
2.5.12 Diesel Particulate Filter (If Equipped)​
2.5.13 Broken Cable Indicator System​
2.5.14 Platform Control Enable System​
2.5.15 Transport Position Sensing System​
2.5.16 Beyond Transport - Drive Speed Cutback System​
2.5.17 Drive/Steer – Boom Function Interlock System (CE/UKCA ONLY)​
2.5.18 Jib Stow System​
2.5.19 Envelope Tracking System​
2.5.20 Moment Control System​
2.5.21 Boom Control System (BCS) Functional Check (Push to Test) System​
2.5.22 Controlled Arc System​
2.5.23 Controlled Boom Angle System​
2.5.24 Envelope Tracking​
2.5.25 Slow Down System​
2.5.26 Dual Capacity System​
2.5.27 Platform Load Sensing System (LSS)​
2.5.28 Electronic Platform Leveling​
2.5.29 Boom Control Select​
2.5.30 Electronic Platform Leveling​
2.5.31 Normal Operation​
Clearsky Smart Fleet (If Equipped)​
2.6.1 General​
2.6.2 ClearSky Smart Fleet™ — Access Control​
Maintenance and Inspection Schedules
Machine Preparation, Inspection, and Maintenance​
3.1.1 General​
3.1.2 Preparation, Inspection, and Maintenance​
3.1.3 Pre-Start Inspection​
3.1.4 Pre-Delivery Inspection and Frequent Inspection​
3.1.5 Annual Machine Inspection​
3.1.6 Preventive Maintenance​
Service and Guidelines​
3.2.1 General​
3.2.2 Safety and Workmanship​
3.2.3 Cleanliness​
3.2.4 Components Removal and Installation​
3.2.5 Component Disassembly and Reassembly​
3.2.6 Pressure-Fit Parts​
3.2.7 Bearings​
3.2.8 Gaskets​
3.2.9 Bolt Usage and Torque Application​
3.2.10 Hydraulic Lines and Electrical Wiring​
3.2.11 Hydraulic System​
3.2.12 Lubrication​
3.2.13 Battery​
3.2.14 Welding on JLG Equipment​
Preventive Maintenance and Inspection Schedule​
3.3.1 Daily​
3.3.2 First 50 Hours​
3.3.3 First 150 Hours​
3.3.4 Every 150 Hours or 3 Months​
3.3.5 Every 300 Hours or 6 Months​
3.3.6 Every 500 Hours or 6 Months​
3.3.7 Every 600 Hours or 1 Year​
3.3.8 Every 1000 hours or 2 years​
3.3.9 Every 1200 Hours or 2 Years​
Pins and Composite Bearing Repair Guidelines​
Tires and Wheels​
3.5.1 Tire Inflation​
3.5.2 Tire Damage​
Fuel Tank Inspection​
Boom Inspection and Maintenance​
3.7.1 Wire Rope Tensioning Adjustment​
3.7.2 Wire Rope Tensioning Procedure​
3.7.3 Wire Rope​
3.7.4 Boom Cleanliness Guidelines​
3.7.5 Boom Wear Pad Inspection​
Hydraulic Filter Replacement​
3.8.1 Hydraulic Filter Removal​
3.8.2 Hydraulic Filter Installation​
Turntable Bearing Inspection​
3.9.1 Turntable Bearing Mounting Bolt Condition Check​
3.9.2 Wear Tolerance​
Engine General Inspection​
3.10.1 General Maintenance​
3.10.2 Deutz TD2.9L4 and Deutz TCD2.9L4 (China IV) Engine​
3.10.3 Deutz Engine TCD2.9L4 (T4F and Stage V)​
Bio Fuel In Deutz Engines​
3.11.1 General​
3.11.2 Bio Fuel​
3.11.3 Biological Contamination In Fuels​
Deutz EMR5​
Generator Inspection​
3.13.1 Every 250 hours​
3.13.2 Every 500 hours​
3.13.3 Overload Protection​
3.13.4 Inspecting Brushes, Replacing Brushes, and Cleaning Slip Rings​
Testing, Calibrations and Special Procedures
Special Tools​
4.1.1 Multimeter​
4.1.2 Threadlocking Compound​
4.1.3 Tools Catalog​
Testing Procedures​
4.2.1 Starter​
4.2.2 SkyGuard​
4.2.3 LSS Testing and Evaluation​
4.2.4 System Test​
Calibration Procedures​
4.3.1 JLG Analyzer​
4.3.2 Calibration Preparation​
4.3.3 Load Sensing System Calibration​
4.3.4 Calibrating Tilt Sensor​
4.3.5 Calibrating Platform Level​
4.3.6 Calibrating Lift Crack Point​
4.3.7 Calibrating Telescope Crack point​
4.3.8 Calibrating the Boom Sensors​
4.3.9 Calibrating Steer​
4.3.10 Calibrating Drive​
Special Procedures​
4.4.1 Drive Cutout Override Service Mode​
4.4.2 Fuel Tank Cleaning and Drying​
4.4.3 Cylinder Drift​
4.4.4 Oscillating Axle Bleeding Procedure and Lockout Test​
4.4.5 Axle Limit Switch Adjustment Procedure​
System Software
Load Sensing System (LSS)​
5.1.1 Theory of Operation​
5.1.2 Load Sensing Gauge Removal/ Installation​
5.1.3 Diagnostic Menu​
JLG Analyzer​
5.2.1 Introduction​
5.2.2 Hand Held Analyzer​
5.2.3 To Connect the JLG Control System Analyzer​
5.2.4 Using the Analyzer​
5.2.5 Changing the Access Level Of The Hand Held Analyzer​
5.2.6 Adjusting Parameters Using The Hand Held Analyzer​
5.2.7 Machine Setup​
5.2.8 Analyzer Flow Chart​
Analyzer Software Accessibility​
5.3.1 Machine Set-Up​
5.3.2 Machine Personality Settings/Function Speeds​
Function Test​
5.4.1 Machine Orientation When Setting Function Speeds​
CANbus Communications (reference)​
5.5.1 CANbus Communication Failure​
Service Mode​
5.6.1 Load Sensing System​
5.6.2 Drive Cutout Override​
Electronic Platform Leveling​
5.7.1 Platform Leveling Fault Warning​
5.7.2 Fault Response​
5.7.3 CAN Errors​
5.7.4 Additional Platform and Jib Valves​
5.7.5 Platform Leveling Calibration Procedure​
ClearSky (CS550) Configuration and Troubleshooting​
5.8.1 ClearSky Smart FleetTM CS550 Configuration​
5.8.2 Troubleshooting​
Fault Codes
Fault Codes Introduction​
Machine Fault Codes​
6.2.1 General​
6.2.2 ClearSky Smart Fleet DTC Fault Codes​
ClearSky CS550 Troubleshooting Procedures​
Machine Diagnostics Parameters​
Deutz EMR Fault Codes​
6.5.1 EMR5 Fault Codes​
Hydraulics
General Information and Safety​
Theories of Operation​
7.2.1 Cylinders​
7.2.2 Valves​
Hydraulic Components​
7.3.1 Hydraulic Oil Tank​
7.3.2 Lubricating O-rings In The Hydraulic System​
7.3.3 Pressure Setting Procedure​
7.3.4 Set Up of the Function Pump​
7.3.5 Adjustments Made at the Main Valve Bank​
7.3.6 Adjustments Made at the Frame Valve Bank​
7.3.7 Adjustments Made at the Platform Valve Bank​
7.3.8 Drive & Function Pump Start Up Procedures​
Torque Values​
Standard Hydraulic Diagram- Boom And Turntable​
7.5.1 Boom​
7.5.2 Turntable (with Rexroth Pump)​
7.5.3 Turntable (with Sauer Pump)​
Hydraulic Diagram - Chassis​
7.6.1 4WD Chassis (with Rexroth Pump)​
7.6.2 4WD Chassis (with Sauer Pump)​
7.6.3 Oscillating Axle​
7.6.4 Axle Extend and Steer​
Electricals
General Information​
8.1.1 Applying Silicone Dielectric Compound to Electrical Connections​
8.1.2 Dielectric Grease Application​
Electrical Connectors​
8.2.1 Deutsch Connectors​
Electrical Component Terminology​
Harness Layouts​
Board Layouts​
AMP Connector​
8.6.1 Applying Silicone Dielectric Compound to AMP Connectors​
8.6.2 Assembly​
8.6.3 Disassembly​
8.6.4 Wedge Lock​
8.6.5 Service - Voltage Reading​
Wiring Harness and Connector Label Diagrams​
Telematics Gateway​
8.8.1 Telematics-Ready (TCU) Plug​
Removal and Installation
Wheel and Tire​
Chassis/Frame Assembly​
9.2.1 Chassis Component​
9.2.2 Drive Hub​
9.2.3 Drive Motor​
9.2.4 Spindle​
9.2.5 Axle​
Boom​
9.3.1 Boom Component​
9.3.2 Boom Removal​
9.3.3 Rotator​
9.3.4 Load Sensing Pin Removal and Installation​
9.3.5 Boom/Jib Sensors and Switches Installation​
9.3.6 Adjusting the Proximity Switch​
9.3.7 Hose Routing Procedure​
Platform​
9.4.1 Platform (Rapid Replaceable Platform)​
9.4.2 Platform Support (Traditional Design)​
9.4.3 Platform Support (Rapid Replaceable Platform)​
9.4.4 Bolt-on External Fall Arrest​
Engine​
9.5.1 Component Terminology​
9.5.2 Deutz TD2.9 L4 Engine​
9.5.3 Deutz TCD2.9L4 Engine​
9.5.4 Deutz TCD2.9L4 (Stage V) Engine​
9.5.5 Deutz TCD2.9L4 (China IV) Engine​
9.5.6 Engine Serial Number​
9.5.7 Engine Replacement​
9.5.8 Surge Tank​
9.5.9 Pump Coupling Kit​
9.5.10 Air Filter Assembly​
9.5.11 Radiator Assembly​
9.5.12 Thermostat​
9.5.13 Coolant Temperature Sensor​
9.5.14 Relay Assembly​
9.5.15 Starter​
9.5.16 Alternator​
9.5.17 Fuel Tank​
9.5.18 Pre- Fuel Filter and Fuel Pump​
Transmission​
Hydraulic Cylinders​
9.7.1 Main Boom Lift Cylinder​
9.7.2 Steer Cylinder​
9.7.3 Axle Extend Cylinder​
9.7.4 Axle Lockout Cylinder​
Hydraulic Valves​
9.8.1 Platform Control Valve (Rapid Replaceable)​
9.8.2 Platform Valve (Traditional Design)​
9.8.3 Main Control Valve​
9.8.4 Traction Valve​
9.8.5 Axle Extend and Steer Valve​
Hydraulic Pumps​
9.9.1 Charge Pump​
9.9.2 Function Pump​
9.9.3 Drive Pump​
9.9.4 Rexroth Pump​
Electrical Components​
9.10.1 Battery​
9.10.2 Cold Weather Package​
Turntable​
9.11.1 Swing Bearing​
9.11.2 Swing Brake​
9.11.3 Procedure for Setting Gear Backlash​
9.11.4 Swing Drive Lubrication​
9.11.5 Rotary Coupling​
Generator Pulley​
9.12.1 Removal​
9.12.2 Installation​
ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)​
9.13.1 ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)​
Disassembly and Assembly
Drive Assembly​
10.1.1 Drive Hub - If Equipped With Reggiana Riduttori​
10.1.2 Tools​
10.1.3 Disassembly​
10.1.4 Assembly​
10.1.5 Drive Motor​
Boom and Jib Assembly​
10.2.1 Disassembly​
10.2.2 Assembly​
10.2.3 Boom Lubrication Application​
10.2.4 Boom Shimming Procedure​
10.2.5 Jib Rotator Orientation​
10.2.6 Jib Lift End of Stroke Dampening​
10.2.7 Required Tools​
10.2.8 Rotary Actuator​
Pumps​
10.3.1 Drive Pumps (Rexroth)​
10.3.2 Charge Pressure Relief Valve Adjustment​
10.3.3 Mechanical Centering of Pump​
10.3.4 Hydraulic Centering of Control Modules​
10.3.5 High Pressure Relief Valve Adjustments​
10.3.6 Removal and Inspection of Charge Pump​
10.3.7 Routine Maintenance​
10.3.8 Removal and Installation of Shaft Seal​
10.3.9 Function Pump (Rexroth)​
10.3.10 Spare Parts​
10.3.11 Sealing the Drive Shaft​
10.3.12 Disassembly and Assembly of the Complete Unit​
10.3.13 Assembly​
10.3.14 Adjustments​
10.3.15 Tightening Torques​
10.3.16 Pump Control Disassembly for Cleaning​
10.3.17 Drive Pumps (SAUER)​
10.3.18 Port Locations and Gauge Installation​
10.3.19 Initial Startup Procedures​
10.3.20 Troubleshooting​
10.3.21 Adjustments​
10.3.22 Removing the Pump​
10.3.23 Inspection​
10.3.24 Replacement​
10.3.25 Electric Control Module​
10.3.26 Shaft, Seal, and Bearing​
10.3.27 Charge Pump​
10.3.28 Charge Check / HPRV​
10.3.29 Charge Pressure Relief Valve​
10.3.30 Control Cutoff Valve​
10.3.31 Function Pump (SAUER)​
10.3.32 Inspection​
10.3.33 Assembly​
10.3.34 Charge pump (Sauer)​
10.3.35 Assembly​
10.3.36 Troubleshooting​
Hydraulic Cylinders​
10.4.1 Disassembly​
10.4.2 Cleaning and Inspection​
10.4.3 Assembly​
10.4.4 Steer Cylinder​
10.4.5 Cleaning And Inspection​
10.4.6 Assembly​
Turntable​
10.5.1 Swing Drive Hub​
10.5.2 Swing Drive​
10.5.3 Swing Brake​
10.5.4 Swing Motor​
10.5.5 Rotary Coupling Seal Kit​
Generator Disassembly and Assembly​
10.6.1 Generator Disassembly and Assembly​
Powertrack​
10.7.1 One Piece Bracket Maintenance​
10.7.2 Two Piece Bracket Maintenance​
10.7.3 Snap Rings and Screws​
Torque/Connection Information
Hydraulic Fittings​
11.1.1 Tapered Thread Types​
11.1.2 Straight Thread Types, Tube and Hose Connections​
11.1.3 Straight Thread Types, Port Connections​
11.1.4 Flange Connection Types​
11.1.5 Tightening Methods​
11.1.6 Assembly and Torque Specifications​
11.1.7 General Tube Type Fitting Assembly Instructions​
11.1.8 Assembly Instructions for American Standard Pipe Thread Tapered Connections.​
11.1.9 Assembly Instructions for British Standard Pipe Thread Tapered Connections​
11.1.10 Assembly Instructions for 37° (JIC) Flare Fittings​
11.1.11 Assembly Instructions for 45° SAE Flare Fittings​
11.1.12 Assembly Instructions for O-Ring Face Seal (ORFS) Fittings​
11.1.13 Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)​
11.1.14 Assembly Instructions for Bulkhead (BH) Fittings​
11.1.15 Assembly Instructions for O-Ring Boss (ORB) Fittings​
11.1.16 Assembly Instructions for Adjustable Port End Metric Fittings​
11.1.17 Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Ends​
11.1.18 Assembly instructions for Adjustable Port End (BSPP) Fittings​
11.1.19 Assembly Instructions for Flange Connections: (FL61 and FL62)​
11.1.20 Double Wrench Method​
11.1.21 FFWR and TFFT Methods​
11.1.22 Adjustable Stud End Assembly​
11.1.23 O-ring Installation (Replacement)​
Torque Charts​
11.2.1 SAE Fastener Torque Chart​
11.2.2 Metric Fastener Torque Chart​
Schematics
Hydraulic Schematics​
Electrical Schematics​
Deutz EMR5 Schematics​
Generator Schematics​
12.4.1 Lead Connection List​




 
Top