Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

XCMG Rough Terrain Crane XCR90_E Operation and Maintenance Manual

#1
Download this document, you need 1050 Gallons
Download Now
XCMG Rough Terrain Crane XCR90_E Operation and Maintenance Manual
Size: 125.45 MB
Format: PDF
Language: English
Brand: XCMG
Type of Machine: Rough Terrain Crane
Type of Manual: Operation and Maintenance Manual, Electric and Hydraulic Diagrams
Model: XCMG XCR90_E Rough Terrain Crane
Number of Pages: 1026 Pages

Contents:
1 Preface
1.1 Preface​
1.2 Manufacturer information​
1.3 Safety symbols and their meanings​
1.4 Data recording device​
1.5 Intended use of the crane​
1.6 Unintended use of the crane​
1.7 Residual risks​
1.8 Prohibited operations​
1.9 Reasonably foreseeable misuse​
1.10 Scope of usage limitations​
1.11 Operational aids​
1.12 Unit conversion chart​
2 Manual description
2.1 About the manual​
2.2 Text structure and symbols of the manual​
2.3 Supplementary information​
2.4 Other text types​
3 General safety information explanation
3.1 Highway traffic regulation​
3.2 Breaking in a new vehicle​
3.3 Driving safety​
3.4 Planning the job​
3.5 Responsible party​
3.6 General requirements for all responsible parties​
3.7 Responsibilities and duties of responsible parties​
3.7.1 Manufacturer​
3.7.2 Authorized agent​
3.7.3 Authorized representative​
3.7.4 Owner​
3.7.5 Operator​
3.7.6 User​
3.7.7 Maintenance personnel (technician/engineer)​
3.8 Personal protective equipment (PPE)​
3.9 Risks and hazards on the crane​
3.9.1 Fire and explosion hazards​
3.9.2 Lightning stroke​
3.9.3 Mechanical injury​
3.9.4 Scald hazards​
3.9.5 Chemical burns​
3.9.6 Asbestos dust hazard​
3.9.7 Poisoning and suffocation hazard​
3.9.8 Hazards involving the battery​
3.9.9 Safety rules for battery and battery disconnect switch​
3.9.10 Environmental risk​
3.10 Obstacles around the crane​
3.11 Safety distance to overhead power lines​
3.12 Safe distance from underground power supply lines/water supply systems​
3.13 Working near transmitters​
3.14 Working near aerodromes/airfields​
3.15 Grounding the crane​
3.16 Response measures in dangerous situations​
3.16.1 Brief introduction​
3.16.2 Machine in contact with power line​
3.16.3 Machine on fire​
3.16.4 Handling abnormalities​
3.17 Safety signs and labels​
3.17.1 Brief introduction​
3.17.2 Mandatory signs​
3.17.3 Prohibition signs​
3.17.4 Warning signs​
3.17.5 Rescue signs​
3.17.6 Fire-fighting signs​
3.17.7 Signs on the machine​
4 Safety guidelines and safe operation
4.1 Safety requirements​
4.1.1 Exits for emergency escape​
4.1.2 Fire extinguisher and first-aid kit (if equipped)​
4.1.3 Safety hammer​
4.1.4 Delivery requirements​
4.1.5 General requirements about safe crane operation​
4.1.6 Safety at the construction site​
4.1.7 Jobsite requirements for setting up the crane​
4.1.8 Setting requirements for slopes and trenches​
4.1.9 Influence of the wind​
4.1.10 Lifting operation with two or more cranes​
4.1.11 Hand signs​
4.2 Safe access of crane​
4.2.1 Walking surfaces and stepping surfaces​
4.2.2 Access​
4.3 Ladder​
4.3.1 Safety guidelines​
4.3.2 Notes on usage​
4.3.3 Three-point support​
4.3.4 Light work and heavy work​
4.3.5 Platform ladder​
4.3.6 Herringbone ladder​
4.3.7 Herringbone ladder (fixed-type)​
4.4 Safety inspections before operation​
4.4.1 Safety rules​
4.4.2 Safety devices​
4.4.3 Ensuring good visibility​
4.4.4 Children safety​
4.5 Start the machine safely​
4.5.1 Preparation and inspection before boarding​
4.5.2 Safely boarding the machine​
4.5.3 Seat adjustment​
4.5.4 Fasten the seat belt (if equipped)​
4.5.5 Inspections before starting the engine​
4.5.6 Safety rules for starting the engine​
4.5.7 Safety rules for engine start in cold weather​
4.5.8 Safety rules for starting the engine with auxiliary cables​
4.5.9 Inspections after starting the engine​
4.6 Installation and assembly safety​
4.6.1 Brief introduction​
4.6.2 Requirements for installation and assembly personnel​
4.6.3 Installation site requirements​
4.6.4 Machine assembly​
4.6.5 Unauthorized modifications​
4.6.6 Counterweight disassembly and front-end working device​
4.7 Safe operation of the machine​
4.7.1 Pre-operation safety rules​
4.7.2 Precautions for operation​
4.7.3 Safe parking of the machine​
4.7.4 Requirements for setting up crane before operation​
4.7.5 Handling the load​
4.7.6 Stop the machine​
4.7.7 Safety rules for towing​
4.8 Safety maintenance and service​
4.8.1 Maintenance safety requirements​
4.8.2 Correct welding​
4.8.3 Keep the cab clean​
4.8.4 Keep the machine clean​
4.8.5 Environmental protection and disposal​
4.9 Precautions against disasters and measures for survival​
4.9.1 Emergency measures for fire​
4.9.2 Emergency measures for electrical accidents​
4.9.3 Emergency measures for fall from height​
4.9.4 Precautions against natural disasters​
4.9.5 Emergency measures for power failure​
4.10 Operational risks in special environments​
4.10.1 General​
4.10.2 Operating on loose ground​
4.10.3 Operation under OMs of falling, flying articles and invaders​
4.10.4 Operation in high temperature environments​
4.10.5 Operation in dusty or sandy environment​
4.10.6 Operation in rainy and humid environments​
4.10.7 Operation in snowy days​
5 General introduction
5.1 Terminology​
5.2 Crane model​
5.3 Main applications​
5.4 Operating conditions​
5.5 Product Introduction​
5.5.1 Composition of the crane​
5.5.2 Optional configurations​
5.6 Technical specifications​
5.6.1 Dimensions​
5.6.2 Main technical parameters​
5.7 Signs​
5.7.1 Introduction​
5.7.2 Product nameplates​
5.7.3 Signs​
6 Transporting and storing crane
6.1 General safety rules for transportation​
6.2 Technical specifications for transportation​
6.2.1 Overall dimensions​
6.2.2 Specifications of parts to be transported​
6.2.3 Specifications of removable parts​
6.3 Packaging and protection​
6.4 Lifting and fixing solutions​
6.4.1 Notes​
6.4.2 Lifting the crane​
6.4.3 Fastening for loading and shipping the crane​
6.4.4 Lifting and securing the jib​
6.4.5 Lifting the counterweight​
6.4.6 Hook block​
6.5 Transportation with a trailer​
6.5.1 Fastening for loading and shipping the crane​
6.5.2 Transportation with a trailer​
6.6 Waterway transportation​
6.7 Railway transportation​
6.8 Storage of crane​
6.8.1 Parking, storage and protection​
6.8.2 Crane storage in low ambient temperature​
7 Assembly and trial operation
7.1 Cautions​
7.2 Counterweight​
7.2.1 Cautions​
7.2.2 Counterweight structure​
7.2.3 Setting of counterweight self-assembly/disassembly OM​
7.2.4 Counterweight bracket assembly​
7.2.5 Placing and fixing the counterweight​
7.2.6 Counterweight fixing bracket assembly​
7.2.7 Placing counterweight on the counterweight bracket​
7.2.8 Counterweight assembly​
7.2.9 Counterweight OM setting​
7.2.10 Counterweight disassembly​
7.3 Jib​
7.3.1 Cautions​
7.3.2 Fixed jib assembly​
7.3.3 Fixed jib offset angle adjustment​
7.3.4 Disassembly of the fixed jib​
7.4 Auxiliary sheave​
7.4.1 Cautions​
7.4.2 Assembly of auxiliary sheave​
7.4.3 Stowing the auxiliary sheave​
7.5 Wire rope​
7.5.1 Cautions​
7.5.2 Introduction to wire rope sockets​
7.5.3 Replacing the wire rope​
7.5.4 Re-reeving the winch rope​
7.5.5 Correcting the rope twist​
7.6 Hook block​
7.6.1 Cautions​
7.6.2 Introduction to hook blocks​
7.6.3 Handling of hook block​
7.6.4 Assembly and disassembly of hook block​
8 Cab operation
8.1 Overview of the cab​
8.2 Breaker​
8.3 Fire extinguisher​
8.4 Sun screen​
8.5 Telescoping pedal​
8.6 Control switches​
8.7 Radio panel​
8.8 Monitoring device​
8.9 Control levers​
8.10 Ignition lock​
8.11 Touchscreen display​
8.12 Travel parameter monitoring display​
8.13 Steering mode selector switch​
8.14 Reading light in the cab​
9 Chassis operation
9.1 Before driving​
9.1.1 Operation of battery disconnect switch​
9.1.2 Opening and closing the door​
9.1.3 Steering wheel adjustment​
9.1.4 Adjustment of seat​
9.1.5 Adjust the armrest box​
9.1.6 Rearview mirror adjustment​
9.1.7 Inspection of lights​
9.1.8 Operation of lights​
9.1.9 The use of seat belt​
9.1.10 Inspection of engine fuel level​
9.1.11 Inspection of engine coolant level​
9.1.12 Inspection of engine oil level​
9.1.13 Inspections of AdBlue/DEF solution level​
9.1.14 Inspection of transmission oil level​
9.1.15 Transmission oil filling port​
9.1.16 Inspection of filters​
9.1.17 Inspection of tires​
9.2 Chassis operation​
9.2.1 Engine start​
9.2.2 Engine stop​
9.2.3 DPF regeneration operation​
9.2.4 Transmission operation​
9.2.5 Steering operation​
9.2.6 Operation of four-wheel drive mode​
9.2.7 Braking operation​
9.2.8 Towing operation​
9.2.9 Operation of the windshield wiper​
9.3 Accelerator operation​
9.4 HVAC operation​
9.5 Suspension operation​
9.6 Breaking in a new vehicle​
9.7 Winter operation​
10 Crane operation
10.1 Safety devices​
10.1.1 Load moment indicator (LMI)​
10.1.2 Outrigger pressure and length detection​
10.1.3 Slewing angle encoder​
10.1.4 Lowering Limiter (counter)​
10.1.5 Pilot control switch​
10.1.6 Electronic level gauge​
10.1.7 Engine oil pressure warning​
10.1.8 Winch monitoring device​
10.1.9 Turntable locking device​
10.2 Preparation for crane operation​
10.2.1 Precautions for operation​
10.2.2 Conditions for lifting operation​
10.2.3 Inspection of safety devices​
10.2.4 Inspections of wire ropes​
10.2.5 Inspection of the slewing brake switch​
10.2.6 Inspection before lifting operations​
10.3 Outrigger control devices​
10.3.1 Outrigger control (cab)​
10.4 Outrigger control​
10.4.1 Crane jobsite​
10.4.2 Outrigger OM selection​
10.4.3 Adjusting the outrigger floats​
10.4.4 Outrigger control under full extension OM​
10.4.5 Outrigger control under 75% extended, half-extended or fully-retracted OM​
10.5 Operation of turntable locking device​
10.6 Operating winches​
10.7 Boom telescoping operation​
10.8 Boom luffing operation​
10.9 Slewing operation​
10.10 Combined movement operation​
10.11 Operation of the crane on tires​
10.12 Operation of the crane traveling with a suspended load​
10.13 Operations after lifting operation​
11 Maintenance and service
11.1 Safety instructions​
11.1.1 Safety​
11.1.2 Personnel​
11.1.3 Description of intervals and tasks​
11.1.4 Maintenance intervals​
11.1.5 Securing against start up​
11.1.6 Securing against falls​
11.1.7 Preventing fires​
11.1.8 Protecting against burns​
11.1.9 Protecting from scalding​
11.1.10 Rotating parts​
11.1.11 Using permissible service fluids​
11.1.12 Protecting against the hazards of service fluids​
11.1.13 Replacing damaged crane components​
11.1.14 After replacement of components​
11.1.15 Tire size​
11.2 Warranty and coverage​
11.3 XCMG after-sales service​
11.4 Taking an oil sample​
11.5 Crane maintenance​
11.5.1 Cleaning the crane​
11.5.2 Anti-corrision​
11.5.3 Protecting the crane against corrosion for storage​
11.5.4 Protecting the crane against corrosion for shutdown​
11.6 Storage​
11.6.1 Storage conditions​
11.6.2 Pre-storage processing​
11.6.3 Maintenance during storage​
11.6.4 Returning to service​
11.7 Safe disposal proposal​
11.7.1 Safe disposal of service fluids and lubricants​
11.7.2 Batteries​
11.7.3 Disposing of the machine​
11.8 Regular maintenance and inspections​
11.8.1 Checklist for crane operator​
11.8.2 Checklist for crane maintenance personnel​
11.9 Maintenance tasks of crane operator​
11.9.1 Safety​
11.9.2 Engine​
11.9.3 Cooling system​
11.9.4 Air filtration system​
11.9.5 Fuel system​
11.9.6 AdBlue/DEF system​
11.9.7 Air intake and exhaust systems​
11.9.8 Transmission​
11.9.9 Steering system​
11.9.10 Wheel​
11.9.11 Maintenance and service of the cab wiper​
11.9.12 Maintenance and service of the cab​
11.9.13 Chassis hydraulic system​
11.9.14 Hydraulic hose lines​
11.9.15 Boom​
11.9.16 Winch system​
11.9.17 Slewing system​
11.9.18 Check the slewing bearing connection​
11.10 Maintenance tasks of crane maintenance technician​
11.10.1 Safety​
11.10.2 Engine​
11.10.3 Cooling system​
11.10.4 Air filtration system​
11.10.5 Fuel system​
11.10.6 AdBlue/DEF system​
11.10.7 Air intake and exhaust systems​
11.10.8 Transmission​
11.10.9 Steering system​
11.10.10 Axle​
11.10.11 Braking system​
11.10.12 Maintenance and service of the cab​
11.10.13 Electrical system​
11.10.14 Drive shaft​
11.10.15 Wheel​
11.10.16 Chassis hydraulic system​
11.10.17 Slewing bearing connection​
11.10.18 Slewing system​
11.10.19 Winch system​
11.10.20 Boom telescoping system​
11.10.21 Rope sheave​
11.10.22 Wire rope​
11.10.23 HVAC in the cab​
11.10.24 Maintenance and service of the cab wiper​
11.10.25 Adjustment of outrigger sliders​
11.11 Plans for oil filling and lubrication​
11.11.1 Filling amounts​
11.11.2 Lubrication guidelines​
11.11.3 Lubrication operation modes​
11.12 Operating fluids and lubricants​
11.12.1 Oil brands and filling amount​
11.12.2 Comparison between foreign and domestic oil brands​
12 Periodic inspections
12.1 General introduction​
12.2 Inspection plan​
12.3 Inspection of steel structures​
12.3.1 Basic principles and procedure​
12.3.2 Repair welding​
12.3.3 Inspection points​
12.3.4 Inspections of lifting points and fixing points​
12.4 Inspections of boom telescoping system​
12.5 Checking boom sliders and bolts​
12.6 Inspections of hook blocks​
12.7 Inspections of sheaves​
12.8 Inspections of rollers​
12.9 Inspections of telescoping conditions of outriggers​
12.10 Winch system inspections​
12.11 Inspections of safety ropes​
12.12 Inspection of wire ropes​
12.13 Inspection of accumulator​
12.14 Inspections of pin connections​
12.15 Inspections of load-bearing equipment installation​
12.15.1 Inspections of mounting bolts for tightness​
12.15.2 Inspections of mounting bolts for damage​
12.16 Inspections of slewing bearing connection​
12.17 Inspections of load handling equipment and assembly aids​
12.18 Inspections of fastening equipment​
12.19 Inspections of fuel tank and hydraulic oil tank​
12.20 Inspections of hydraulic line​
12.20.1 Safety guidelines​
12.20.2 Interval​
12.20.3 Inspections of service life​
12.20.4 Inspections of hydraulic hose lines for damage and leakages​
12.20.5 Documenting the inspection results​
12.20.6 Replacing hydraulic hose lines​
12.21 Inspections of ladders​
12.22 Inspection chart for cranes​
13 Common troubles and trouble-shooting
13.1 Troubleshooting rules​
13.2 Display fault code​
13.2.1 Engine faults and solutions​
13.2.2 Transmission faults and solutions​
13.2.3 LMI faults and solutions​
13.2.4 Controller faults and solutions​
13.3 Common troubles and solution​
13.3.1 Power system​
13.3.2 Axle and suspension system​
13.3.3 Braking system​
13.3.4 Steering system​
13.3.5 Outrigger system​
13.3.6 Slewing system​
13.3.7 Winch system​
13.3.8 Luffing system​
13.3.9 Electrical system​
13.3.10 Hydraulic system​
13.3.11 Other systems​
14 Decommissioning and disposal
14.1 Proper disassembly of equipment​
14.2 Disposal​
15 Appendix
15.1 EC Declaration​
15.2 Wire rope certificate​
15.3 Hook block certificate​
15.4 Tightening torque of main bolts​
15.5 Maintenance checklist​
16 Schematics
16.1 Overview of the hydraulic and electrical components with identification​
16.2 Schematics for the superstructure electrical system​
16.3 Schematics for the chassis electrical system​
16.4 Schematics for the hydraulic system​
16.5 Schematic for the steering hydraulic system​
16.6 Schematic for the braking hydraulic system​




 
Top