NIFTYLIFT Articulating Boom Lifts TD150T 39494 Operating Parts Manual And Diagram 2016
- Download this document, you need 1605 Gallons
NIFTYLIFT Articulating Boom Lifts TD150T 39494 Operating Parts Manual And Diagram 2016
Size: 12.96 MB
Format: PDF
Language: English
Brand: NIFTYLIFT
Type of Machine: Articulating Boom Lifts
Type of Manual: Operating Manual, Parts Manual, Electrical Schematic, Hydraulic Schematic
Model: NIFTYLIFT TD150T 39494 Articulating Boom Lifts
Serial Number: 39494
Publication Date: 2016
List of Files:
01_TD150T HYDRAULIC DIAGRAM D81315 (issue 003) 39494.pdf (5 Pages)
02_Track Drive matrix D81465 (issue 002) 39494.pdf (1 Pages)
03_CIRCUIT, SCHEMATIC, TD150T USA D81572 (issue 011) 39494.pdf (5 Pages)
04_Kubota D722 Z482 Operators Manual And Wiring Diagram M50291 (issue 002) 39494 1J090-8916-1.pdf (39 Pages)
Contents:
E.pdf
SAFE OPERATION
SERVICING OF THE ENGINE
NAMES OF PARTS
PRE-OPERATION CHECK
BREAK-IN
DAILY CHECK
To prevent trouble from occurring, it is important to know the conditions of the engine well. Che...
OPERATING THE ENGINE
STARTING THE ENGINE(NORMAL)
COLD WEATHER STARTING
STOPPING THE ENGINE
CHECKS DURING OPERATION
REVERSED ENGINE REVOLUTION AND REMEDIES
MAINTENANCE
SERVICE INTERVALS
PERIODIC SERVICE
FUEL
ENGINE OIL
RADIATOR
AIR CLEANER
ELECTRIC WIRING
FAN BELT
CARRIAGE AND STORAGE
CARRIAGE
STORAGE
TROUBLESHOOTING
If the engine does not function properly, use the following chart to identify and correct the cause.
SPECIFICATIONS
WIRING DIAGRAMS
05_TD150T TD42T PARTS MANUAL M50322 (issue 003) 39494.pdf (76 Pages)
Contents:
Front Cover
Parts Order Form
Contents
chassis assembly
1.1 Base assembly
1.2 Stabiliser assembly
1.3 Button box assembly
superstructure
2.1 Superstructure assembly
2.2 Diesel engine - Part 1
2.3 Diesel engine - Part 2
2.4 Slew assembly
2.5 Boom rest assembly
2.6 Control valve (4 spool)
2.7 Button box assembly
2.8 Control box assembly
boom assemblies
3.1 Boom 1 assembly
3.2 Telescopic boom assembly
3.3 Lift Cylinder
3.4 Levelling cylinders
3.5 Telescope cylinder
3.6 Levelling valve
cage assembly
4.1 Cage assembly
4.2 Cage weigh assembly
4.3 Control panel assembly
4.4 Control valve (5 spool)
labelling
5.1 Label locations TD150T
Figure 5.1
Labels 1 to 32
Labels 33 to 41
06_TD150T TD42T OPERATING MANUAL UK USA M50334 (issue 003) 39494.pdf (59 Pages)
Size: 12.96 MB
Format: PDF
Language: English
Brand: NIFTYLIFT
Type of Machine: Articulating Boom Lifts
Type of Manual: Operating Manual, Parts Manual, Electrical Schematic, Hydraulic Schematic
Model: NIFTYLIFT TD150T 39494 Articulating Boom Lifts
Serial Number: 39494
Publication Date: 2016
List of Files:
01_TD150T HYDRAULIC DIAGRAM D81315 (issue 003) 39494.pdf (5 Pages)
02_Track Drive matrix D81465 (issue 002) 39494.pdf (1 Pages)
03_CIRCUIT, SCHEMATIC, TD150T USA D81572 (issue 011) 39494.pdf (5 Pages)
04_Kubota D722 Z482 Operators Manual And Wiring Diagram M50291 (issue 002) 39494 1J090-8916-1.pdf (39 Pages)
Contents:
E.pdf
SAFE OPERATION
SERVICING OF THE ENGINE
NAMES OF PARTS
PRE-OPERATION CHECK
BREAK-IN
DAILY CHECK
To prevent trouble from occurring, it is important to know the conditions of the engine well. Che...
OPERATING THE ENGINE
STARTING THE ENGINE(NORMAL)
COLD WEATHER STARTING
STOPPING THE ENGINE
CHECKS DURING OPERATION
REVERSED ENGINE REVOLUTION AND REMEDIES
MAINTENANCE
SERVICE INTERVALS
PERIODIC SERVICE
FUEL
ENGINE OIL
RADIATOR
AIR CLEANER
ELECTRIC WIRING
FAN BELT
CARRIAGE AND STORAGE
CARRIAGE
STORAGE
TROUBLESHOOTING
If the engine does not function properly, use the following chart to identify and correct the cause.
SPECIFICATIONS
WIRING DIAGRAMS
05_TD150T TD42T PARTS MANUAL M50322 (issue 003) 39494.pdf (76 Pages)
Contents:
Front Cover
Parts Order Form
Contents
chassis assembly
1.1 Base assembly
1.2 Stabiliser assembly
1.3 Button box assembly
superstructure
2.1 Superstructure assembly
2.2 Diesel engine - Part 1
2.3 Diesel engine - Part 2
2.4 Slew assembly
2.5 Boom rest assembly
2.6 Control valve (4 spool)
2.7 Button box assembly
2.8 Control box assembly
boom assemblies
3.1 Boom 1 assembly
3.2 Telescopic boom assembly
3.3 Lift Cylinder
3.4 Levelling cylinders
3.5 Telescope cylinder
3.6 Levelling valve
cage assembly
4.1 Cage assembly
4.2 Cage weigh assembly
4.3 Control panel assembly
4.4 Control valve (5 spool)
labelling
5.1 Label locations TD150T
Figure 5.1
Labels 1 to 32
Labels 33 to 41
06_TD150T TD42T OPERATING MANUAL UK USA M50334 (issue 003) 39494.pdf (59 Pages)
More the random threads same category:
- NIFTYLIFT Articulating Boom Lifts SD64 47665 Operating Service Parts Manual And Diagram 2021
- NIFTYLIFT Articulating Boom Lifts SD64 48461 Operating Service Parts Manual And Diagram 2021
- NIFTYLIFT Articulating Boom Lifts SD64 49473 Operating Service Parts Manual And Diagram 2021
- NIFTYLIFT Articulating Boom Lifts SD64 49474 Operating Service Parts Manual And Diagram 2021
- NIFTYLIFT Articulating Boom Lifts SD64 49486 Operating Service Parts Manual And Diagram 2022
- NIFTYLIFT Articulating Boom Lifts SD64 53056 Operating Service Manual And Diagram 2022
- NIFTYLIFT Articulating Boom Lifts SD64 55247 Operating Service Parts Manual And Wiring Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 55262 Operating Service Parts Manual And Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 55267 Operating Service Parts Manual And Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 55712 Operating Service Parts Manual And Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 55728 Operating Service Parts Manual And Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 55731 Operating Service Parts Manual And Diagram 2023
- NIFTYLIFT Articulating Boom Lifts SD64 56740 Operating Service Parts Manual And Diagram 2024
- NIFTYLIFT Articulating Boom Lifts SD64 56744 Operating Service Parts Manual And Diagram 2024
- NIFTYLIFT Articulating Boom Lifts SD64 57399 Operating Service Parts Manual And Diagram 2024