Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

LGMG Mobile Elevating Work Platform SR5390D Service and Repair Manual SM-2537110181

#1
Download this document, you need 1050 Gallons
Download Now
LGMG Mobile Elevating Work Platform SR5390D Service and Repair Manual SM-2537110181
Size: 8.92 MB
Format: PDF
Language: English
Brand: LGMG
Type of Machine: Mobile Elevating Work Platform
Type of Manual: Service and Repair Manual, Electric and Hydraulic Diagrams
Model: LGMG SR5390D Mobile Elevating Work Platform
Part Number: SM-2537110181
Number of Pages: 110 Pages

Contents:
Chapter 1 Safety
1.1 Compliance​
1.2 Before maintenance​
1.3 Safety considerations for maintenance​
1.4 After maintenance​
Chapter 2 Specifications
2.1 About this chapter​
2.2 Torque specifications​
2.3 Key procedure table​
Chapter 3 Repair
3.1 About this chapter​
3.2 Platform assembly​
3.2.1 How to replace PCU​
3.2.2 Removing the platform assembly​
3.2.3 Removing the extension platform assembly​
3.3 Scissor assembly​
3.3.1 How to disassemble the scissor assembly​
3.3.2 Replacing the platform scissor slider​
3.3.3​
3.3.4 Replacing the chassis scissor slider​
3.3.5 Replacing the upper/lower lift cylinder​
3.3.6 Replacing the cylinder valve block​
3.3.7​
3.4 Chassis assembly​
3.4.1 Replacing the GCU assembly​
3.4.2 Removing the hydraulic oil tank​
3.4.3 Replacing the float cylinder​
3.4.4 Replacing the tire​
3.4.5 eplacing the outrigger cylinder​
3.4.6​
3.4.6 How to remove the front axle assembly​
3.4.7 Removing the rear axle assembly​
3.4.8 How to remove the engine​
Chapter 4 Commissioning
4.1 About this chapter​
4.2 Starting calibration​
4.2.1 No-load calibration​
4.2.2 Rated load calibration​
4.2.3 Inclination calibration​
4.2.4 Leveling and calibrating the outrigger​
4.2.5 Adjusting the lift travel switch​
4.3 Valves​
4.3.1 Control manifold of upper lift cylinder​
4.3.2​
4.3.2 Control manifold of lower lift cylinder​
4.3.3 Travel control manifold​
4.3.4 Lift control manifold​
4.3.5 Oscillating control manifold​
4.3.6 Outrigger cylinder valve​
4.3.7 Replacing the outrigger cylinder valve​
4.3.8 Replacing the upper/lower lift cylinder valve block assembly​
4.3.9​
4.3.9 Adjustment method of relief valve​
4.4 Testing​
4.4.1 Testing the coil​
4.4.2​
4.4.2 Adjusting the lifting pressure​
4.4.3​
4.4.3 Adjusting the steering pressure​
4.4.4 Adjusting the pressure of float cylinder​
4.4.5 Adjusting the outrigger level​
4.5 LPG mode-gas leak test​
4.6 LPG mode-machine performance test​
Chapter 5 Appendix
5.1 About this chapter​
5.2 Compliance​
5.3 Before troubleshooting​
5.4 System menu​
5.5 Fault code and diagnostics​
5.5.1 Fault cold and troubleshooting guide​
5.6 Platform overload diagnosis​
5.7 Schematic diagram​
5.7.1 Machine structure​
5.7.2 Electrical component positions​
5.8 Pin number definition​
5.8.1 PCU pin number definition​
5.8.2 GCU pin number definition​
5.9 Troubleshooting of electrical system​
5.9.1 Diagnostic chart​
5.10 Schematics​
5.10.1 Electrical schematic​
5.10.2 Hydraulic schematic​
5.11 Wiring diagram​
5.12 Diagram of common symbols​
5.12.1 Diagram of common electrical part symbols​
5.12.2 Diagram of common hydraulic part symbols​




 
Top