Momed80

Sharing
Joined
Likes
150
Gallons
35,046

Kubota Excavator U35-4 Operators Manual RC788-8131-5 2013

#1
Download this document, you need 500 Gallons
Download Now
Kubota Excavator U35-4 Operators Manual RC788-8131-5 2013
Size: 7.66 MB
Format: PDF
Language: English
Brand: Kubota
Type of Machine: Excavator
Type of Manual: Operators Manual
Model: Kubota U35-4 Excavator
Engine: D1709-M-DI-E4-US1, D1703-M-DI-E4-US2
Part Number: RC788-8131-5
Publication Date: 2013
Number of Pages: 120 Pages

Contents:

Safe Operation
Dealer Service
Technical Data
Description Of Machine Parts
Instrument Panel And Control Elements
Checks Before Start
Daily Checks
Checking The Devices
Starter Switch
Display Selector Switch
Lcd For Normal Operation
Warning Lamp
Lcd For Warning
Setting The Clock
Reordering The Year/Month/Day And Changing The Am/Pm System To The 24-Hour One 14
Log Record
Periodic Check
If All The Check Points Are Not Displayed At A Glance On A Single Screen
When The Check-Up Is Completed
Horn Switch
Light Switch
Aux Port Enable Switch
Auto Idle Control Switch
Throttle Potentiometer
Travel Speed Switch
Cab Type Machines
Wiper/Washer Switch
Interior Lamp
Opening/Closing Of Cab Door
Opening/Closing Of Front Cab Window
Opening/Closing Of Side Cab Window
Emergency Hammer
Air Conditioner
Air Flow
Air Control Vent
Control Panel
Operation
Handling The Safety Devices
Pilot Control Lock Lever
Operation Of The Engine
Starting The Engine
Starting The Engine Under Cold Conditions
Starting With An Auxiliary Battery
Observe Following Guidelines When Starting With An Auxiliary Battery
Check Points After Starting The Engine
Stopping The Engine
Engine Stop Button
Precautions In Case Of Overheat
Excavator Operation
Running-In Of The New Excavator
Do Not Work With Full Engine Rpm's Or Full Loads During The First 50 Working Hours
Oil Change In The Run-In Stage
Adjusting The Operator's Seat
Seat Belt
Starting
Pilot Control Lock Lever
Driving
Drive Levers (Right,Left)
Turns
Pivot Turn
Spin Turn
Up And Downhill Driving
Parking On A Slope
Operation Of The Dozer
Two Pattern Selection System (Tpss)
Pattern Change
Operation Of The Boom
Operation Of The Arm
Operation Of The Bucket
Unit Swing And Boom Swing Operation
Unit Swing Operation
Boom Swing Operation
Auxiliary Port Operation
Selecting The Action Modes
Aux Port Handling Procedure
Setting The Maximum Flow Volume
How To Release Pressure Trapped In The Hydraulic System
1-Way Or 2-Way Circuit Selection Valve Operation
Auto Idle (Ai) Operation
Important Information On Excavator Operation
Transporting The Excavator On A Vehicle
Lifting Of The Excavator
Maintenance
Maintenance Intervals
Opening And Closing Of Covers
Opening/Closing Of The Engine Hood
Opening/Closing Of The Side Cover
Where To Store The Tool
Cup Holder
Where To Store The Grease Gun
Where To Keep Operator's Manual
Daily Checks
Checking Coolant Level
Checking Fuel Level
Checking Engine Oil Level
Checking Hydraulic Oil Level
Checking V-Belt
Checking Radiator And Oil Cooler
Checking Washer Liquid
Checking And Cleaning Engine And Electrical Wiring
Washing Whole Machine
Greasing Front Attachments (Without Bucket Pin And Boom Swing Fulcrum)
Greasing Bucket Pin
Greasing Boom Swing Fulcrum
Regular Checks And Maintenance Work
Every 50 Service Hours
Draining The Water From The Fuel Tank
Draining Water Separator
Checking Battery Condition
Greasing Swing Bearing Teeth
Every 200 Service Hours
Adjusting V-Belt Tension
Checking Radiator Hoses And Clamps
Grease Swing Ball Bearing
Inspection And Cleaning Air Filter Element
Air Filter Maintenance
Checking Fuel Line And Intake Air Line
Air Conditioner
Cleaning Air Filter
Checking Air-Conditioner Condenser
Every 250 Service Hours
Changing Engine Oil (First Engine Oil Change After 50 Service Hours)
Replacing Engine Oil Filter Cartridge (First Engine Oil Filter Change After 50 Service
Hours)
Every 500 Service Hours
Drive Unit Oil Change(First Oil Change Of The 50 Hours)
Replacing Fuel Filter Cartridge
Replacing Hydraulic Return Filter Element (First Replacement After 250 Service Hours) 72
Replacing Breather Filter
Replacing Fan Belt
Every 1000 Service Hours
Replacing The Hydraulic Pilot Filter Element
Hydraulic Oil Change (Including Replacing Of The Suction Filter In The Hydraulic Tank) 73
Hydraulic Oil Check With Hydraulic Hammers
Every 1000 Service Hours Or Once A Year
Replacing Air Filter Element
Every 1500 Service Hours
Checking Fuel Injection Nozzle (Injection Pressure)
Every 2000 Service Hours
Changing Front Idler And Track Roller Oil
Checking The Alternator And Starter Motor
Every 3000 Service Hours
Checking Injection Pump
Annual Servicing
Electrical Wiring And Fuses
Checking The Electrical Circuit
Checking Air-Conditioner Pipes And Hoses
Biennial Servicing
Replacing Air-Conditioner Pipes And Hoses
Replacement Of Radiator Hoses And Hose Clamps
Changing Radiator Coolant
Replacing Fuel Hoses And Hose Clamps
Replacing Intake Air Line
Servicing As Required
Checking Amount Of Refrigerant (Gas)
Other Adjustments And Replacements
Purging Of The Fuel System
Adjustment Of Tracks
Special Information When Using Rubber Tracks
Changing The Bucket
Fuses
Replacing Fuses
Fuse Capacities And Circuits
Auxiliary Electric
Slow Blow Fuse
Troubleshooting
Operation Under Cold Weather Conditions
Preparation For Operation In Cold Weather
Procedure After Completing Work
Long Storage
Recommended Oils
Appendices
Main Dimensions
Lifting Capacity
List Of Screens
List Of Normal Screens
Navigation List Of Screens


 
Top