Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Scissor Lift ES1932 ES1932i Parts Manual 31220680

#1
Download this document, you need 1605 Gallons
Download Now
JLG Scissor Lift ES1932 ES1932i Parts Manual 31220680
Size: 27.10 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Manual
Model: JLG ES1932 ES1932i Scissor Lift
Part Number: 31220680
Publication Date: 2024
Number of Pages: 360 Pages

Contents:
SECTION 1 - FRAME
FIGURE 1-1. DRIVE MOTOR AND STEER INSTALLATION (MACHINES WITH SN STARTING WITH M2)​
FIGURE 1-2. DRIVE MOTOR AND STEER INSTALLATION (MACHINES WITH SN STARTING WITH 12 & B2) (ALL SPECS)​
FIGURE 1-3. DRIVE MOTOR AND STEER INSTALLATION (MACHINES WITH SN STARTING WITH 12 & B2) (JAPANESE SPEC)​
FIGURE 1-4. MOTOR & SPINDLE ASSEMBLY - LEFT (JAPANESE SPEC)​
FIGURE 1-5. MOTOR & SPINDLE ASSEMBLY - RIGHT (JAPANESE SPEC)​
FIGURE 1-6. DRIVE MOTOR ASSEMBLY​
FIGURE 1-7. STEER INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 1-8. STEER SPINDLE COVER INSTALLATION (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 1-9. STEER SPINDLE COVER INSTALLATION (CHINA SPECS)​
FIGURE 1-10. REAR WHEEL HUB AND FRAME CLAMPS INSTALLATION​
FIGURE 1-11. HUB ASSEMBLY - REAR​
FIGURE 1-12. TIRE AND WHEEL INSTALLATION​
FIGURE 1-13. POTHOLE PROTECTION INSTALLATION​
FIGURE 1-14. POTHOLE PROTECTION SYSTEM INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 1-15. TILT SENSOR INSTALLATION​
FIGURE 1-16. BATTERY CHARGER INSTALLATION - DELTA-Q (WITHOUT COMMUNICATION PORT)​
FIGURE 1-17. BATTERY CHARGER INSTALLATION - DELTA-Q (WITH COMMUNICATION PORT)​
FIGURE 1-18. BATTERY CHARGER INSTALLATION - GREEN POWER (LOCALLY SUPPLIED PLUG) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 1-19. STROBE LIGHT INSTALLATION – SINGLE (AMBER) (WITH GUARD)​
FIGURE 1-20. STROBE LIGHT INSTALLATION – DUAL (AMBER) (WITH GUARD)​
FIGURE 1-21. BEACON ZN INSTALLATION​
FIGURE 1-22. ALARM INSTALLATION (AMBIENT/WHITE NOISE) (OPTIONAL)​
FIGURE 1-23. LADDER INSTALLATION​
FIGURE 1-24. FRAME COVERS INSTALLATION (ES1932)​
FIGURE 1-25. FRAME COVERS INSTALLATION (ES1932I)​
SECTION 2 - GROUND CONTROLS
FIGURE 2-1. PUMP/MOTOR/TANK/HOSES INSTALLATION​
FIGURE 2-2. PUMP/MOTOR/TANK ASSEMBLY​
FIGURE 2-3. CLEANGUARD INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2 & M2 )​
FIGURE 2-4. CLEANGUARD INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 2-5. ELECTRICAL COMPONENTS INSTALLATION (MACHINES WITH SN STARTING WITH B2 & M2 )​
FIGURE 2-6. ELECTRICAL COMPONENTS INSTALLATION #1 (MACHINES WITH SN STARTING WITH 12)​
FIGURE 2-7. ELECTRICAL COMPONENTS INSTALLATION #2 (MACHINES WITH SN STARTING WITH 12)​
FIGURE 2-8. ACCESS CONTROL INSTALLATION​
FIGURE 2-9. MDI INSTALLATION​
FIGURE 2-10. BATTERIES INSTALLATION - STANDARD BATTERIES (U.S. BRAND)​
FIGURE 2-11. BATTERIES INSTALLATION - STANDARD BATTERIES (TROJAN BRAND)​
FIGURE 2-12. BATTERIES INSTALLATION - AGM BATTERIES​
FIGURE 2-13. BATTERIES INSTALLATION - AGM EVCG BATTERIES​
FIGURE 2-14. INVERTER INSTALLATION (OPTIONAL)​
FIGURE 2-15. DOORS INSTALLATION​
FIGURE 2-16. DOORS INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 2-17. GROUND CONTROL INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
SECTION 3 - SCISSORS ARMS
FIGURE 3-1. SCISSORS ARMS INSTALLATION (MACINES WITH SN STARTING WITH M2) (Prior to SN M200060314)​
FIGURE 3-2. SCISSORS ARMS INSTALLATION (MACHINES WITH SN STARTING WITH B2)​
FIGURE 3-3. SCISSORS ARMS INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 3-4. SCISSORS ARMS INSTALLATION (MACINES WITH SN STARTING WITH M2) (SN M200060314 through M200064098)​
FIGURE 3-5. SCISSORS ARMS INSTALLATION (MACINES WITH SN STARTING WITH M2) (SN M200060314 through M200064098)​
FIGURE 3-6. SCISSORS ARMS INSTALLATION (MACHINES WITH SN STARTING WITH M2)(ALL SPECS) (SN M200064098 to Present)​
FIGURE 3-7. SCISSORS ARMS INSTALLATION (MACHINES WITH SN STARTING WITH M2)(ALL SPECS) (SN M200064098 to Present)​
FIGURE 3-8. SCISSORS ARMS KIT​
FIGURE 3-9. ARM GUARD INSTALLATION​
SECTION 4 - PLATFORM
FIGURE 4-1. PLATFORM INSTALLATION (MACHINES WITH SN STARTING WITH12, B2 & M2)​
FIGURE 4-2. PLATFORM INSTALLATION (MACHINES WITH SN STARTING WITH G2)​
FIGURE 4-3. PLATFORM EXTENSION INSTALLATION​
FIGURE 4-4. RAILS INSTALLATION - FIXED (INSIDE TUBE SLIDER)​
FIGURE 4-5. RAILS INSTALLATION - FIXED (OUTSIDE TUBE SLIDER)​
FIGURE 4-6. RAILS INSTALLATION - FOLD-DOWN RAILS/GATE ENTRY (ANSI EXPORT & CHINA SPECS)​
FIGURE 4-7. RAILS INSTALLATION - QUIK ACCESS (ANSI & JAPANESE SPECS ONLY)​
FIGURE 4-8. RAILS INSTALLATION - QUIK FOLD-DOWN (ALL SPECS EXCEPT AUSTRALIAN, CE, KOREAN & UK CA SPECS)​
FIGURE 4-9. RAILS INSTALLATION - QUIK FOLD-DOWN (CE & UK CA SPECS)​
FIGURE 4-10. RAILS INSTALLATION - STANDARD FOLD-DOWN RAILS (ALL SPECS)​
FIGURE 4-11. HANDLE EXTENSION INSTALLATION​
FIGURE 4-12. GATE LATCH INSTALLATION - OPTIONAL (ALL SPECS EXCEPT KOREAN SPECS)​
FIGURE 4-13. PLATFORM CONTROL INSTALLATION (FRONT MOUNT) (WITH QUICK FOLD-DOWN PLATFORM)​
FIGURE 4-14. PLATFORM CONTROL INSTALLATION (FRONT MOUNT) (WITH FIXED PLATFORM)​
FIGURE 4-15. PLATFORM CONTROL INSTALLATION (SIDE MOUNT) (MACHINES WITH SN STARTING WITH 12, B2 & M2)​
FIGURE 4-16. PLATFORM CONTROL INSTALLATION (SIDE MOUNT) (MACHINES WITH SN STARTING WITH G2) (CHINA & ANSI EXPORT SPEC)​
FIGURE 4-17. PLATFORM CONTROL INSTALLATION (SIDE MOUNT) (MACHINES WITH SN STARTING WITH G2) (ANSI EXPORT SPEC ONLY)​
FIGURE 4-18. DRIVE/STEER CONTROLLER ASSEMBLY (AUSTRALIAN, CE & UK CA SPECS)​
FIGURE 4-19. PLATFORM CONTROL BOX ASSEMBLY (WITH FRONT MOUNT CONTROLS)​
FIGURE 4-20. ELECTRICIANS TREE ACCESSORY​
FIGURE 4-21. ELECTRICIAN TREE INSTALLATION​
FIGURE 4-22. OVERHEAD PROTECTION INSTALLATION (ANSI EXPORT & KOREAN SPECS)​
FIGURE 4-23. PANEL CARRIER INSTALLATION (AUSTRALIAN, CE & UK CA SPECS)​
FIGURE 4-24. PIPE RACK ASSEMBLY ACCESSORY​
FIGURE 4-25. PIPE RACK INSTALLATION​
FIGURE 4-26. USB/PHONE CRADLE INSTALLATION​
FIGURE 4-27. WORKLIGHT INSTALLATION​
FIGURE 4-28. WORKSTATION ACCESSORY​
FIGURE 4-29. WORKSTATION INSTALLATION​
SECTION 5 - CYLINDER
FIGURE 5-1. LIFT CYLINDER ASSEMBLY (MACINES WITH SN STARTING WITH M2)​
FIGURE 5-2. LIFT CYLINDER ASSEMBLY (MACINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 5-3. LIFT CYLINDER ASSEMBLY (MACINES WITH SN STARTING WITH G2)​
FIGURE 5-4. STEER CYLINDER ASSEMBLY (MACHINES WITH SN STARTING WITH M2)​
FIGURE 5-5. STEER CYLINDER ASSEMBLY (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 5-6. STEER CYLINDER ASSEMBLY​
SECTION 6 - ELECTRICAL
FIGURE 6-1. AC BOX AT PLATFORM INSTALLATION - 110V GFI (ANSI, ANSI EXPORT, CHINA AND JAPANESE SPECS)​
FIGURE 6-2. AC BOX AT PLATFORM INSTALLATION - 110V IEC YELLOW (CE & UK CA SPECS)​
FIGURE 6-3. AC BOX AT PLATFORM INSTALLATION - 220V IEC BLUE (CE & UK CA SPECS)​
FIGURE 6-4. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 POST GROUND (CE & UK CA SPECS)​
FIGURE 6-5. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 SIDE GROUND (CE & UK CA SPECS)​
FIGURE 6-6. AC BOX AT PLATFORM INSTALLATION - 220V AFSINT 107 (CE & UK CA SPECS)​
FIGURE 6-7. AC BOX AT PLATFORM INSTALLATION - 220V CHINA PLUG (CHINA SPECS)​
FIGURE 6-8. AC BOX AT PLATFORM INSTALLATION - 220V LOCALLY SUPPLIED COMPONENTS (ALL SPECS)​
FIGURE 6-9. BREAKER BOX KIT WITH 1 DOUBLE BREAKER​
FIGURE 6-10. BREAKER BOX KIT WITH 3 BREAKERS​
FIGURE 6-11. CHASSIS HARNESS​
FIGURE 6-12. CHARGER PLUG INSTALLATION - LOCALLY SUPPLIED PLUG (ALL SPECS)​
FIGURE 6-13. CHARGER PLUG INSTALLATION - 110V PLUG (ALL SPECS EXCEPT AUSTRALIAN, CHINA, CE, KOREA & UK CA SPECS)​
FIGURE 6-14. CHARGER PLUG INSTALLATION (KOREAN PLUG)​
FIGURE 6-15. CHARGER PLUG INSTALLATION - 220V CEE7 PLUG (CE & UK CA SPECS)​
FIGURE 6-16. CHARGER PLUG INSTALLATION - 220V AFSINT 107 (CE & UK CA SPEC)​
FIGURE 6-17. CHARGER PLUG INSTALLATION - 110V IEC YELLOW (CE & UK CA SPEC)​
FIGURE 6-18. CHARGER PLUG INSTALLATION - 220V IEC BLUE (CE & UK CA SPEC)​
FIGURE 6-19. CHARGER PLUG INSTALLATION (CHINA PLUG)​
FIGURE 6-20. CHARGER PLUG INSTALLATION (AUSTRALIAN PLUG)​
FIGURE 6-21. CHARGER TO BATTERY HARNESS​
FIGURE 6-22. CLEARSKY INSTALLATION - 3 WIRE (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-23. CLEARSKY INSTALLATION - 3G (ANSI EXPORT, CE & UK CA SPECS)​
FIGURE 6-24. CLEARSKY INSTALLATION - 3G (AUSTRALIAN SPECS)​
FIGURE 6-25. CLEARSKY INSTALLATION - 4G (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-26. CLEARSKY INSTALLATION - 4G (CHINA SPECS)​
FIGURE 6-27. CLEARSKY HARNESS - 3 WIRE (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-28. CLEARSKY JUMPER HARNESS - 3 WIRE (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-29. CLEARSKY HARNESS - 3G & 4G (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-30. CLEARSKY HARNESS - 4G (CHINA SPECS)​
FIGURE 6-31. CLEARSKY SPLICE HARNESS - 3G & 4G (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 6-32. DRIVE HARNESS​
FIGURE 6-33. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE (ALL SPECS EXCEPT KOREAN & AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH B2 & M2)​
FIGURE 6-34. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE (AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH B2)​
FIGURE 6-35. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE AND WITH FOOTSWITCH (MACHINES WITH SN STARTING WITH B2)​
FIGURE 6-36. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE OR FOOTSWITCH (MACHINES WITH SN STARTING WITH G2)​
FIGURE 6-37. GROUND TO PLATFORM CABLE INSTALLATION - WITH FOOTSWITCH (MACHINES WITH SN STARTING WITH G2)​
FIGURE 6-38. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE (ALL SPECS EXCEPT KOREAN & AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH B2 & M2)​
FIGURE 6-39. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE (AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH B2)​
FIGURE 6-40. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE AND FOOTSWITCH (MACHINES WITH SN STARTING WITH B2)​
FIGURE 6-41. GROUND TO PLATFORM CABLE INSTALLATION - SCISSORS ARM CABLE ONLY (MACHINES WITH SN STARTING WITH 12)​
FIGURE 6-42. GROUND TO PLATFORM CABLE INSTALLATION - PLATFORM CABLE ONLY (STRAIGHT CABLE) (MACHINES WITH SN STARTING WITH 12)​
FIGURE 6-43. GROUND TO PLATFORM CABLE INSTALLATION - PLATFORM CABLE ONLY (COILED CABLE) (MACHINES WITH SN STARTING WITH 12)​
FIGURE 6-44. JUMPER HARNESS TO LIFT DOWN​
FIGURE 6-45. LIFT DOWN HARNESS​
FIGURE 6-46. PLATFORM HARNESS​
FIGURE 6-47. PLATFORM BOX HARNESS (MACHINES WITH SN STARTING WITH 12, B2 & M2)​
FIGURE 6-48. PLATFORM BOX HARNESS (MACHINES WITH SN STARTING WITH G2)​
FIGURE 6-49. RECEPTACLE BOX KIT - 110V GFI​
FIGURE 6-50. RECEPTACLE BOX KIT - 110V IEC YELLOW (CE & UK CA SPEC)​
FIGURE 6-51. RECEPTACLE BOX KIT - 220V IEC BLUE (CE & UK CA SPEC)​
FIGURE 6-52. RECEPTACLE BOX KIT - 220V CEE7 POST GROUND (CE & UK CA SPEC)​
FIGURE 6-53. RECEPTACLE BOX KIT - 220V CEE7 SIDE GROUND (CE & UK CA SPEC)​
FIGURE 6-54. RECEPTACLE BOX KIT - 220V AFSINT 107 (CE & UK CA SPEC)​
FIGURE 6-55. WORKLIGHT GROUND TO PLATFORM CABLE​
FIGURE 6-56. WORKLIGHT HARNESS​
SECTION 7 - DECALS
FIGURE 7-1. DECAL INSTALLATION - ANSI SPECS (ENGLISH LANGUAGE)​
FIGURE 7-2. DECAL INSTALLATION - AUSTRALIAN & JAPANESE SPECS (ENGLISH LANGUAGE)​
FIGURE 7-3. DECAL INSTALLATION - BRAZIL SPECS (PORTUGUESE/SPANISH LANGUAGES)​
FIGURE 7-4. DECAL INSTALLATION - CE & UK CA SPECS (ENGLISH LANGUAGE)​
FIGURE 7-5. DECAL INSTALLATION - CHINA SPECS (ENGLISH/CHINESE LANGUAGES)​
FIGURE 7-6. DECAL INSTALLATION - CSA SPECS (ENGLISH/FRENCH LANGUAGES)​
FIGURE 7-7. DECAL INSTALLATION - KOREAN SPECS (ENGLISH/KOREAN LANGUAGES)​
FIGURE 7-8. DECAL INSTALLATION - LATIN AMERICAN SPECS (ENGLISH/SPANISH LANGUAGES)​
FIGURE 7-9. DECAL INSTALLATION - OPTIONS​
SECTION 8 - RECOMMENDED SERVICE PARTS STOCK
FIGURE 8-1. RECOMMENDED SERVICE PARTS STOCK​
SECTION 9 - SPECIAL OPTIONS/ACCESSORIES/KITS
FIGURE 9-1. SPECIAL OPTIONS/ACCESSORIES/KITS​
PART NUMBER INDEX


 
Top