Hyundai

Sub-Man
Joined
Likes
86
Gallons
178,635

JLG Scissor Lift ES1932 ES1932i Parts Manual 31217453

#1
Download this document, you need 1605 Gallons
Download Now
JLG Scissor Lift ES1932 ES1932i Parts Manual 31217453
Size: 22.55 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Manual
Model: JLG ES1932 ES1932i Scissor Lift
Part Number: 31217453
Publication Date: 2024
Number of Pages: 288 Pages

Contents:
SECTION 1 - FRAME
FIGURE 1-1. DRIVE MOTOR AND STEER INSTALLATION (MACHINES WITH SN STARTING WITH M2)​
FIGURE 1-2. DRIVE MOTOR AND STEER INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 1-3. DRIVE MOTOR ASSEMBLY​
FIGURE 1-4. STEER SPINDLE COVER INSTALLATION (ALL SPECS EXCEPT CHINA SPECS)​
FIGURE 1-5. STEER SPINDLE COVER INSTALLATION (CHINA SPECS)​
FIGURE 1-6. REAR WHEEL HUB AND FRAME CLAMPS INSTALLATION​
FIGURE 1-7. HUB ASSEMBLY - REAR​
FIGURE 1-8. TIRE AND WHEEL INSTALLATION​
FIGURE 1-9. POTHOLE PROTECTION INSTALLATION​
FIGURE 1-10. TILT SENSOR INSTALLATION​
FIGURE 1-11. BATTERY CHARGER INSTALLATION - DELTA-Q WITHOUT COMMUNICATION PORT (LOCALLY SUPPLIED PLUG)​
FIGURE 1-12. BATTERY CHARGER INSTALLATION - DELTA-Q WITH COMMUNICATION PORT (LOCALLY SUPPLIED PLUG)​
FIGURE 1-13. BATTERY CHARGER INSTALLATION - DELTA-Q WITHOUT COMMUNICATION PORT (110V PLUG)​
FIGURE 1-14. BATTERY CHARGER INSTALLATION - DELTA-Q WITH COMMUNICATION PORT (110V PLUG)​
FIGURE 1-15. BATTERY CHARGER INSTALLATION - DELTA-Q WITHOUT COMMUNICATION PORT (AUSTRALIAN PLUG)​
FIGURE 1-16. BATTERY CHARGER INSTALLATION - DELTA-Q WITH COMMUNICATION PORT (AUSTRALIAN PLUG)​
FIGURE 1-17. BATTERY CHARGER INSTALLATION - DELTA-Q WITHOUT COMMUNICATION PORT (KOREAN PLUG)​
FIGURE 1-18. BATTERY CHARGER INSTALLATION - DELTA-Q WITH COMMUNICATION PORT (KOREAN PLUG)​
FIGURE 1-19. BATTERY CHARGER INSTALLATION - EAGLE PERFORMANCE (110V PLUG)​
FIGURE 1-20. BATTERY CHARGER INSTALLATION - GREEN POWER (LOCALLY SUPPLIED PLUG)​
FIGURE 1-21. BATTERY CHARGER INSTALLATION - GREEN POWER (CHINA PLUG)​
FIGURE 1-22. BATTERY CHARGER INSTALLATION - DELTA-Q (WITHOUT COMMUNICATION PORT)​
FIGURE 1-23. BATTERY CHARGER INSTALLATION - DELTA-Q (WITHOUT COMMUNICATION PORT)​
FIGURE 1-24. BATTERY CHARGER INSTALLATION - GREEN POWER (LOCALLY SUPPLIED PLUG) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 1-25. STROBE LIGHT INSTALLATION – SINGLE (AMBER) (WITH GUARD)​
FIGURE 1-26. STROBE LIGHT INSTALLATION – DUAL (AMBER) (WITH GUARD)​
FIGURE 1-27. ALARM INSTALLATION (AMBIENT/WHITE NOISE) (OPTIONAL)​
FIGURE 1-28. LADDER INSTALLATION​
FIGURE 1-29. FRAME COVERS INSTALLATION (ES1932)​
FIGURE 1-30. FRAME COVERS INSTALLATION (ES1932I)​
SECTION 2 - GROUND CONTROLS
FIGURE 2-1. PUMP/MOTOR/TANK AND HOSES INSTALLATION​
FIGURE 2-2. PUMP/MOTOR/TANK ASSEMBLY​
FIGURE 2-3. CLEANGUARD INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2, M2 & G2)​
FIGURE 2-4. CLEANGUARD INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 2-5. ELECTRICAL COMPONENTS INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2, M2 & G2)​
FIGURE 2-6. ELECTRICAL COMPONENTS INSTALLATION #1 (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 2-7. ELECTRICAL COMPONENTS INSTALLATION #2 (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 2-8. ACCESS CONTROL INSTALLATION​
FIGURE 2-9. MDI INSTALLATION​
FIGURE 2-10. BATTERIES INSTALLATION - AGM BATTERIES WITH DISCONNECT (MACHINES WITH SN STARTING WITH M2)​
FIGURE 2-11. BATTERIES INSTALLATION - AGM EVCG BATTERIES WITH DISCONNECT (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 2-12. BATTERIES INSTALLATION - TROJAN BATTERIES WITH DISCONNECT (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 2-13. BATTERIES INSTALLATION - STANDARD BATTERIES (U.S. BRAND)​
FIGURE 2-14. BATTERIES INSTALLATION - STANDARD BATTERIES (TROJAN BRAND)​
FIGURE 2-15. BATTERIES INSTALLATION - AGM BATTERIES​
FIGURE 2-16. BATTERIES INSTALLATION - AGM EVCG BATTERIES​
FIGURE 2-17. INVERTER INSTALLATION (OPTIONAL)​
FIGURE 2-18. DOORS INSTALLATION​
SECTION 3 - SCISSORS ARMS
FIGURE 3-1. SCISSORS ARMS INSTALLATION (MACINES WITH SN STARTING WITH M2)​
FIGURE 3-2. SCISSORS ARMS INSTALLATION (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 3-3. SCISSORS ARMS KIT​
FIGURE 3-4. ARM GUARD INSTALLATION​
SECTION 4 - PLATFORM
FIGURE 4-1. PLATFORM EXTENSION INSTALLATION​
FIGURE 4-2. RAILS INSTALLATION - FIXED​
FIGURE 4-3. RAILS INSTALLATION - QUIK ACCESS (ANSI & JAPANESE SPECS ONLY)​
FIGURE 4-4. RAILS INSTALLATION - QUIK FOLD-DOWN (ALL SPECS EXCEPT AUSTRALIAN, CE & UK CA SPECS)​
FIGURE 4-5. RAILS INSTALLATION - STANDARD FOLD-DOWN RAILS (ALL SPECS)​
FIGURE 4-6. HANDLE EXTENSION INSTALLATION (OPTIONAL)​
FIGURE 4-7. GATE LATCH INSTALLATION - OPTIONAL (ALL SPECS EXCEPT KOREAN SPECS)​
FIGURE 4-8. PLATFORM CONTROL BOX INSTALLATION (ES1932) (MACHINES WITH SN STARTING WITH M2)​
FIGURE 4-9. PLATFORM CONTROL BOX INSTALLATION (ES1932I) (MACHINES WITH SN STARTING WITH M2)​
FIGURE 4-10. PLATFORM CONTROL BOX INSTALLATION (ES1932) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 4-11. DRIVE/STEER CONTROLLER ASSEMBLY (AUSTRALIAN, CE & UK CA SPECS)​
FIGURE 4-12. USB/PHONE CRADLE INSTALLATION​
FIGURE 4-13. OVERHEAD PROTECTION INSTALLATION (KOREAN SPECS)​
FIGURE 4-14. PANEL CARRIER INSTALLATION (AUSTRALIAN, CE & UK CA SPECS)​
FIGURE 4-15. PIPE RACK INSTALLATION (AUSTRALIAN, CE & UK CA SPECS)​
SECTION 5 - CYLINDER
FIGURE 5-1. LIFT CYLINDER ASSEMBLY (MACINES WITH SN STARTING WITH M2)​
FIGURE 5-2. LIFT CYLINDER ASSEMBLY (MACINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 5-3. STEER CYLINDER ASSEMBLY (MACHINES WITH SN STARTING WITH M2)​
FIGURE 5-4. STEER CYLINDER ASSEMBLY (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
SECTION 6 - ELECTRICAL
FIGURE 6-1. AC BOX AT PLATFORM INSTALLATION - 110V GFI (ANSI, ANSI EXPORT, CHINA AND JAPANESE SPECS)​
FIGURE 6-2. AC BOX AT PLATFORM INSTALLATION - 110V IEC YELLOW (CE & UK CA SPECS)​
FIGURE 6-3. AC BOX AT PLATFORM INSTALLATION - 220V IEC BLUE (CE & UK CA SPECS)​
FIGURE 6-4. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 POST GROUND (CE & UK CA SPECS)​
FIGURE 6-5. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 SIDE GROUND (CE & UK CA SPECS)​
FIGURE 6-6. AC BOX AT PLATFORM INSTALLATION - 220V AFSINT 107 (CE & UK CA SPECS)​
FIGURE 6-7. AC BOX AT PLATFORM INSTALLATION - 220V CHINA PLUG (CHINA SPECS)​
FIGURE 6-8. AC BOX AT PLATFORM INSTALLATION - 220V LOCALLY SUPPLIED COMPONENTS (ALL SPECS)​
FIGURE 6-9. BREAKER BOX KIT WITH 1 DOUBLE BREAKER​
FIGURE 6-10. BREAKER BOX KIT WITH 3 BREAKERS​
FIGURE 6-11. CAN SPLICE HARNESS​
FIGURE 6-12. CHASSIS HARNESS​
FIGURE 6-13. CHARGE TO BATTERY HARNESS​
FIGURE 6-14. CHARGER PLUG INSTALLATION - LOCALLY SUPPLIED PLUG (ALL SPECS)​
FIGURE 6-15. CHARGER PLUG INSTALLATION - 110V PLUG (ALL SPECS EXCEPT AUSTRALIAN, CE, KOREA & UK CA SPECS)​
FIGURE 6-16. CHARGER PLUG INSTALLATION - 220V CEE7 PLUG (CE & UK CA SPECS)​
FIGURE 6-17. CHARGER PLUG INSTALLATION - 220V AFSINT 107 (CE & UK CA SPEC)​
FIGURE 6-18. CHARGER PLUG INSTALLATION - 110V IEC YELLOW (CE & UK CA SPEC)​
FIGURE 6-19. CHARGER PLUG INSTALLATION - 220V IEC BLUE (CE & UK CA SPEC)​
FIGURE 6-20. CHARGER PLUG INSTALLATION (CHINA PLUG)​
FIGURE 6-21. CHARGER PLUG INSTALLATION (AUSTRALIAN PLUG)​
FIGURE 6-22. DRIVE HARNESS​
FIGURE 6-23. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE (ALL SPECS EXCEPT AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH 12, B2, M2 & G2)​
FIGURE 6-24. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE (AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-25. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE AND WITH FOOTSWITCH (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-26. GROUND TO PLATFORM CABLE INSTALLATION - ES1932 WITHOUT PLATFORM COIL CABLE (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-27. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE (ALL SPECS EXCEPT AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH 12, B2, M2 & G2)​
FIGURE 6-28. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE (AUSTRALIAN SPECS) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-29. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE AND FOOTSWITCH (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-30. GROUND TO PLATFORM CABLE INSTALLATION - SCISSORS ARM CABLE ONLY (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-31. GROUND TO PLATFORM CABLE INSTALLATION - PLATFORM CABLE ONLY (STRAIGHT CABLE) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-32. GROUND TO PLATFORM CABLE INSTALLATION - PLATFORM CABLE ONLY (COILED CABLE) (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-33. LIFT DOWN HARNESS​
FIGURE 6-34. PLATFORM CONTROL BOX HARNESS (MACHINES WITH SN STARTING WITH M2)​
FIGURE 6-35. PLATFORM CONTROL BOX HARNESS (MACHINES WITH SN STARTING WITH 12, B2 & G2)​
FIGURE 6-36. RECEPTACLE BOX KIT - 110V GFI​
FIGURE 6-37. RECEPTACLE BOX KIT - 110V IEC YELLOW (CE & UK CA SPEC)​
FIGURE 6-38. RECEPTACLE BOX KIT - 220V IEC BLUE (CE & UK CA SPEC)​
FIGURE 6-39. RECEPTACLE BOX KIT - 220V CEE7 POST GROUND (CE & UK CA SPEC)​
FIGURE 6-40. RECEPTACLE BOX KIT - 220V CEE7 SIDE GROUND (CE & UK CA SPEC)​
FIGURE 6-41. RECEPTACLE BOX KIT - 220V AFSINT 107 (CE & UK CA SPEC)​
SECTION 7 - DECALS
FIGURE 7-1. DECAL INSTALLATION - ANSI SPECS (ENGLISH LANGUAGE)​
FIGURE 7-2. DECAL INSTALLATION - AUSTRALIAN & JAPANESE SPECS (ENGLISH LANGUAGE)​
FIGURE 7-3. DECAL INSTALLATION - BRAZIL SPECS (PORTUGUESE/SPANISH LANGUAGES)​
FIGURE 7-4. DECAL INSTALLATION - CE & UK CA SPECS (ENGLISH LANGUAGE)​
FIGURE 7-5. DECAL INSTALLATION - CHINA SPECS (ENGLISH/CHINESE LANGUAGES)​
FIGURE 7-6. DECAL INSTALLATION - CSA SPECS (ENGLISH/FRENCH LANGUAGES)​
FIGURE 7-7. DECAL INSTALLATION - KOREAN SPECS (ENGLISH/KOREAN LANGUAGES)​
FIGURE 7-8. DECAL INSTALLATION - LATIN AMERICAN SPECS (ENGLISH/SPANISH LANGUAGES)​
FIGURE 7-9. DECAL INSTALLATION - OPTIONS​
SECTION 8 - RECOMMENDED SERVICE PARTS STOCK
FIGURE 8-1. RECOMMENDED SERVICE PARTS STOCK​
SECTION 9 - SPECIAL OPTIONS/ACCESSORIES/KITS
FIGURE 9-1. SPECIAL OPTIONS/ACCESSORIES/KITS​
PART NUMBER INDEX


 
Top