Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Scissor Lift ES1530LC Parts Catalog 31222424

#1
Download this document, you need 2725 Gallons
Download Now
JLG Scissor Lift ES1530LC Parts Catalog 31222424
Size: 15.49 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Catalog
Model: JLG ES1530LC Scissor Lift
Part Number: 31222424
Publication Date: 2025
Number of Pages: 212 Pages

Contents:
SECTION 1 - FRAME
FIGURE 1-1. TRACK DRIVE INSTALLATION (ALL SPECS EXCEPT JAPANESE SPECS)​
FIGURE 1-2. TRACK DRIVE INSTALLATION (JAPANESE SPECS)​
FIGURE 1-3. DRIVE MOTOR ASSEMBLY​
FIGURE 1-4. IDLER WHEEL ASSEMBLY​
FIGURE 1-5. IDLER WHEEL ASSEMBLY​
FIGURE 1-6. ALARM INSTALLATION (AMBIENT/WHITE NOISE)​
FIGURE 1-7. TILT SENSOR INSTALLATION​
FIGURE 1-8. BEACON/STROBE LIGHT INSTALLATION - SINGLE (WITHOUT CLEARSKY)​
FIGURE 1-9. BEACON/STROBE LIGHT INSTALLATION - DUAL (WITHOUT CLEARSKY)​
FIGURE 1-10. BEACON/STROBE LIGHT INSTALLATION - DUAL (WITH CLEARSKY)​
FIGURE 1-11. BATTERY DOOR & FRAME COVERS INSTALLATION (Prior to SN B200086248, Including B200091215)​
FIGURE 1-12. BATTERY DOOR & FRAME COVERS INSTALLATION (SN B200086249 through B200091290, Excluding B200091215)​
FIGURE 1-13. BATTERY DOOR & FRAME COVERS INSTALLATION (SN B200091291 to Present, Including B200091215)​
FIGURE 1-14. LADDER INSTALLATION​
SECTION 2 - GROUND CONTROLS
FIGURE 2-1. HYDRAULIC COMPONENTS INSTALLATION​
FIGURE 2-2. MOTOR/PUMP/TANK ASSEMBLY​
FIGURE 2-3. ELECTRICAL COMPONENTS INSTALLATION (WITHOUT LSS)​
FIGURE 2-4. ELECTRICAL COMPONENTS INSTALLATION (WITH LSS)​
FIGURE 2-5. BATTERY TRAY INSTALLATION​
FIGURE 2-6. BATTERIES INSTALLATION​
FIGURE 2-7. BATTERIES INSTALLATION - STANDARD BATTERIES WITH DISCONNECT​
FIGURE 2-8. BATTERIES INSTALLATION - AGM BATTERIES WITHOUT DISCONNECT​
FIGURE 2-9. BATTERIES INSTALLATION - AGM VISION BATTERIES WITHOUT DISCONNECT​
FIGURE 2-10. BATTERIES INSTALLATION - AGM BATTERIES WITH DISCONNECT​
FIGURE 2-11. BATTERIES INSTALLATION - AGM VISION BATTERIES WITH DISCONNECT​
FIGURE 2-12. BATTERY CHARGER INSTALLATION - DELTA-Q (LESS AC CABLE)​
FIGURE 2-13. BATTERY CHARGER INSTALLATION - DELTA-Q WITH CAN TERMINAL (LESS AC CABLE)​
FIGURE 2-14. BATTERY CHARGER INSTALLATION - GREEN POWER (LESS AC CABLE)​
SECTION 3 - SCISSOR ARMS
FIGURE 3-1. SCISSOR ARMS INSTALLATION (WITHOUT LSS) (Prior to SN B200088154)​
FIGURE 3-2. SCISSOR ARMS INSTALLATION (WITHOUT LSS) (SN B200088154 to Present, SN B200088019 through B200088020, SN B200088101 through B200088106)​
FIGURE 3-3. SCISSOR ARMS INSTALLATION (WITH LSS) (Prior to SN B200088154)​
FIGURE 3-4. SCISSOR ARMS INSTALLATION (WITH LSS) (SN B200088154 to Present, SN B200088019 through B200088020, SN B200088101 through B200088106)​
SECTION 4 - PLATFORM
FIGURE 4-1. PLATFORM INSTALLATION​
FIGURE 4-2. PLATFORM EXTENSION INSTALLATION​
FIGURE 4-3. RAILS INSTALLATION (1.1M TUBE IN TUBE) (Prior to SN B200091613)​
FIGURE 4-4. RAILS INSTALLATION (1.1M TUBE IN TUBE) (SN B200091613 to Present)​
FIGURE 4-5. RAILS INSTALLATION (1.0M TUBE IN TUBE) (Prior to SN B200091613)​
FIGURE 4-6. RAILS INSTALLATION (1.0M TUBE IN TUBE) (SN B200091613 to Present)​
FIGURE 4-7. RAILS INSTALLATION (SIDE BY SIDE) (Prior to SN B200088154, Including B200088019 and B200088020)​
FIGURE 4-8. RAILS INSTALLATION (SIDE BY SIDE) (SN B200088154 through B200091612, Including B200088019 and B200088020)​
FIGURE 4-9. RAILS INSTALLATION (SIDE BY SIDE) (SN B200091613 to Present)​
FIGURE 4-10. GATE LATCH INSTALLATION​
FIGURE 4-11. PLATFORM CONSOLE INSTALLATION​
FIGURE 4-12. CONTROLLER ASSEMBLY​
FIGURE 4-13. PLATFORM CONTROL PLUG INSTALLATION​
SECTION 5 - CYLINDER
FIGURE 5-1. LIFT CYLINDER ASSEMBLY​
SECTION 6 - ELECTRICAL
FIGURE 6-1. AC BOX AT PLATFORM INSTALLATION - 110V GFI (ALL SPECS EXCEPT CE & UK CA SPECS)​
FIGURE 6-2. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 SIDE GROUND (CE & UK CA SPECS)​
FIGURE 6-3. AC BOX AT PLATFORM INSTALLATION - 220V CHINA PLUG (CHINA SPECS)​
FIGURE 6-4. AC BOX AT PLATFORM INSTALLATION - 220V LOCALLY SUPPLIED​
FIGURE 6-5. BREAKER BOX KIT WITH 3 BREAKER​
FIGURE 6-6. CAN SPLICE HARNESS​
FIGURE 6-7. CHARGER HARNESS​
FIGURE 6-8. CHARGER JUMPER HARNESS​
FIGURE 6-9. CHARGER PLUG INSTALLATION (LOCALLY SUPPLIED PLUG) (ALL SPECS EXCEPT AUSTRALIAN SPECS)​
FIGURE 6-10. CHARGER PLUG INSTALLATION (110V PLUG) (ANSI & CSA SPECS)​
FIGURE 6-11. CHARGER PLUG INSTALLATION (CHINA PLUG) (CHINA SPECS)​
FIGURE 6-12. CHARGER PLUG INSTALLATION (KOREAN PLUG) (KOREAN SPECS)​
FIGURE 6-13. CHASSIS HARNESS (WITHOUT LSS)​
FIGURE 6-14. CHASSIS HARNESS (WITH LSS)​
FIGURE 6-15. CLEARSKY CS550 BEACON INSTALLATION​
FIGURE 6-16. DRIVE CONTROL HARNESS​
FIGURE 6-17. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITHOUT AC CABLE/WITH FOOTSWITCH​
FIGURE 6-18. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITH FOOTSWITCH​
FIGURE 6-19. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITHOUT AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 6-20. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 6-21. LIFT DOWN HARNESS (WITHOUT LSS)​
FIGURE 6-22. LIFT DOWN HARNESS (WITH LSS)​
FIGURE 6-23. MOBILE CONTROL HARNESS​
FIGURE 6-24. PLATFORM CONTROL BOX HARNESS​
FIGURE 6-25. RECEPTACLE BOX KIT - 110V GFI​
FIGURE 6-26. RECEPTACLE BOX KIT - 220V CEE7 SIDE GROUND (CE & UK CA SPEC)​
SECTION 7 - DECALS
FIGURE 7-1. DECALS INSTALLATION (ANSI SPECS)​
FIGURE 7-2. DECALS INSTALLATION (CHINA SPECS)​
FIGURE 7-3. DECALS INSTALLATION (CSA SPECS)​
FIGURE 7-4. DECALS INSTALLATION (JAPANESE SPECS)​
FIGURE 7-5. DECALS INSTALLATION (KOREAN SPECS)​
FIGURE 7-6. DECAL INSTALLATION - OPTIONS​
SECTION 8 - RECOMMENDED SERVICE PARTS STOCK
FIGURE 8-1. RECOMMENDED SERVICE PARTS STOCK​
SECTION 9 - SPECIAL OPTIONS/ACCESSORIES/KITS
FIGURE 9-1. SPECIAL OPTIONS/ACCESSORIES/KITS​
PART NUMBER INDEX


 
Top