JLG Scissor Lift ES1330L Parts Catalog 3121795
- Download this document, you need 2725 Gallons
JLG Scissor Lift ES1330L Parts Catalog 3121795
Size: 20.21 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Catalog
Model: JLG ES1330L Scissor Lift
Part Number: 3121795
Publication Date: 2025
Number of Pages: 270 Pages
Contents:
SECTION 1 - FRAME
Size: 20.21 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Catalog
Model: JLG ES1330L Scissor Lift
Part Number: 3121795
Publication Date: 2025
Number of Pages: 270 Pages
Contents:
SECTION 1 - FRAME
FIGURE 1-1. STEER INSTALLATION
FIGURE 1-2. DRIVE COMPONENTS INSTALLATION
FIGURE 1-3. DRIVE MOTOR ASSEMBLY
FIGURE 1-4. TIRE/WHEEL INSTALLATION
FIGURE 1-5. POTHOLE PROTECTION SYSTEM INSTALLATION
FIGURE 1-6. TILT SENSOR INSTALLATION
FIGURE 1-7. BATTERY CHARGER INSTALLATION - DELTA-Q (LOCALLY SUPPLIED PLUG)
FIGURE 1-8. BATTERY CHARGER INSTALLATION - DELTA-Q (110V PLUG)
FIGURE 1-9. BATTERY CHARGER INSTALLATION - DELTA-Q (AUSTRALIAN PLUG)
FIGURE 1-10. BATTERY CHARGER INSTALLATION - DELTA-Q (CE SPECS) (110V IEC YELLOW PLUG)
FIGURE 1-11. BATTERY CHARGER INSTALLATION - DELTA-Q (CE SPECS) (220V IEC BLUE PLUG)
FIGURE 1-12. BATTERY CHARGER INSTALLATION - DELTA-Q (CE SPECS) (AFSINT107 PLUG)
FIGURE 1-13. BATTERY CHARGER INSTALLATION - DELTA-Q (CE SPECS) (CEE7 - GRD PLUG)
FIGURE 1-14. BATTERY CHARGER INSTALLATION - DELTA-Q (LESS AC CABLE)
FIGURE 1-15. BATTERY CHARGER INSTALLATION - DELTA-Q WITH CAN TERMINAL (LESS AC CABLE)
FIGURE 1-16. BATTERY CHARGER INSTALLATION - GREEN POWER (LOCALLY SUPPLIED PLUG)
FIGURE 1-17. BATTERY CHARGER INSTALLATION - GREEN POWER (110V PLUG)
FIGURE 1-18. BATTERY CHARGER INSTALLATION - GREEN POWER (CHINA PLUG)
FIGURE 1-19. BATTERY CHARGER INSTALLATION - GREEN POWER (KOREAN PLUG)
FIGURE 1-20. BATTERY CHARGER INSTALLATION - GREEN POWER (LESS AC CABLE)
FIGURE 1-21. STROBE LIGHT INSTALLATION - SINGLE (AMBER) (WITH GUARD) (SN B200000001 through B200062115)
FIGURE 1-22. STROBE LIGHT INSTALLATION - SINGLE (AMBER) (WITH GUARD) (SN B200062116 through B200065277)
FIGURE 1-23. STROBE LIGHT INSTALLATION - DUAL (AMBER) (WITH GUARD) (SN B200000001 through B200062115)
FIGURE 1-24. STROBE LIGHT INSTALLATION - DUAL (AMBER) (WITH GUARD) (SN B200062116 through B200065277)
FIGURE 1-25. ALARM INSTALLATION (AMBIENT/WHITE NOISE)
FIGURE 1-26. LADDER INSTALLATION
FIGURE 1-27. FRAME COVER INSTALLATION
SECTION 2 - GROUND CONTROLSFIGURE 2-1. HYDRAULIC COMPONENT INSTALLATION
FIGURE 2-2. MOTOR/PUMP/TANK ASSEMBLY
FIGURE 2-3. CLEANGUARD INSTALLATION
FIGURE 2-4. ELECTRICAL COMPONENTS INSTALLATION (WITH LSS) (Prior to SN B200067714)
FIGURE 2-5. ELECTRICAL COMPONENTS INSTALLATION (WITH LSS WITH PLATFORM DRIVE SELECT SWITCH) (CHINA & MEXICO BUILT MACHINES) (SN B200067714 to Present)
FIGURE 2-6. MOBILE CONTROL INSTALLATION
FIGURE 2-7. MDI INSTALLATION
FIGURE 2-8. BATTERIES INSTALLATION - STANDARD BATTERIES WITHOUT DISCONNECT
FIGURE 2-9. BATTERIES INSTALLATION - STANDARD BATTERIES WITH DISCONNECT
FIGURE 2-10. BATTERIES INSTALLATION - AGM BATTERIES WITHOUT DISCONNECT
FIGURE 2-11. BATTERIES INSTALLATION - AGM VISION BATTERIES WITHOUT DISCONNECT
FIGURE 2-12. BATTERIES INSTALLATION - AGM BATTERIES WITH DISCONNECT
FIGURE 2-13. BATTERIES INSTALLATION - AGM VISION BATTERIES WITH DISCONNECT
FIGURE 2-14. DOORS INSTALLATION
SECTION 3 - SCISSORS ARMSFIGURE 3-1. SCISSORS ARMS INSTALLATION WITH LSS
FIGURE 3-2. SCISSORS ARMS INSTALLATION WITH LSS
SECTION 4 - PLATFORMFIGURE 4-1. PLATFORM INSTALLATION
FIGURE 4-2. PLATFORM EXTENSION INSTALLATION
FIGURE 4-3. RAILS INSTALLATION (1.0M TUBE IN TUBE)
FIGURE 4-4. RAILS INSTALLATION (1.1M TUBE IN TUBE)
FIGURE 4-5. RAILS INSTALLATION (SIDE BY SIDE)
FIGURE 4-6. GATE LATCH INSTALLATION
FIGURE 4-7. PLATFORM CONTROL INSTALLATION
FIGURE 4-8. DRIVE/STEER CONTROLLER ASSEMBLY
FIGURE 4-9. PLATFORM CONTROL PLUG INSTALLATION
SECTION 5 - CYLINDERFIGURE 5-1. LIFT CYLINDER ASSEMBLY
FIGURE 5-2. STEER CYLINDER ASSEMBLY
SECTION 6 - HYDRAULICFIGURE 6-1. HYDRAULIC DIAGRAM
SECTION 7 - ELECTRICALFIGURE 7-1. AC BOX AT PLATFORM INSTALLATION - 110V GFI (ALL SPECS EXCEPT CE SPECS)
FIGURE 7-2. AC BOX AT PLATFORM INSTALLATION - 110V IEC YELLOW (CE SPECS)
FIGURE 7-3. AC BOX AT PLATFORM INSTALLATION - 220V IEC BLUE (CE SPECS)
FIGURE 7-4. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 POST GROUND (CE SPECS)
FIGURE 7-5. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 SIDE GROUND (CE SPECS)
FIGURE 7-6. AC BOX AT PLATFORM INSTALLATION - 220V AFSINT 107 (CE SPECS)
FIGURE 7-7. AC BOX AT PLATFORM INSTALLATION - 220V AUSTRALIAN PLUG (AUSTRALIAN SPECS)
FIGURE 7-8. AC BOX AT PLATFORM INSTALLATION - 220V CHINA PLUG (CHINA SPECS)
FIGURE 7-9. AC BOX AT PLATFORM INSTALLATION - 220V LOCALLY SUPPLIED
FIGURE 7-10. BREAKER BOX KIT WITH 1 DOUBLE BREAKER (AUSTRALIAN SPECS)
FIGURE 7-11. BREAKER BOX KIT WITH 1 DOUBLE BREAKER (CE SPECS)
FIGURE 7-12. BREAKER BOX KIT WITH 3 BREAKER
FIGURE 7-13. CHARGER PLUG INSTALLATION (LOCALLY SUPPLIED PLUG) (ALL SPECS EXCEPT ANSI & AUSTRALIAN SPECS)
FIGURE 7-14. CHARGER PLUG INSTALLATION (110V PLUG) (ANSI & CSA SPECS)
FIGURE 7-15. CHARGER PLUG INSTALLATION (AUSTRALIAN PLUG) (AUSTRALIAN SPECS)
FIGURE 7-16. CHARGER PLUG INSTALLATION (110V IEC YELLOW PLUG) (CE SPECS)
FIGURE 7-17. CHARGER PLUG INSTALLATION (220V IEC BLUE PLUG) (CE SPECS)
FIGURE 7-18. CHARGER PLUG INSTALLATION (220V CEE7 PLUG) (CE SPECS)
FIGURE 7-19. CHARGER PLUG INSTALLATION (220V AFSINT107 PLUG) (CE SPECS)
FIGURE 7-20. CHARGER PLUG INSTALLATION (CHINA PLUG) (CHINA SPECS)
FIGURE 7-21. CHARGER PLUG INSTALLATION (KOREAN PLUG) (KOREAN SPECS)
FIGURE 7-22. CHASSIS HARNESS (WITH LSS WITHOUT PLATFORM DRIVE SELECT SWITCH) (CHINA BUILT MACHINES) (Prior to SN B200067714)
FIGURE 7-23. CHASSIS HARNESS (WITH PLATFORM DRIVE SELECT SWITCH) (CHINA & MEXICO BUILT MACHINES)
FIGURE 7-24. DRIVE CONTROL HARNESS
FIGURE 7-25. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITHOUT AC CABLE/WITHOUT FOOTSWITCH
FIGURE 7-26. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH
FIGURE 7-27. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH (AUSTRALIAN SPECS)
FIGURE 7-28. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITHOUT AC CABLE/WITH FOOTSWITCH
FIGURE 7-29. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITH FOOTSWITCH
FIGURE 7-30. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITHOUT AC CABLE/WITHOUT FOOTSWITCH
FIGURE 7-31. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH
FIGURE 7-32. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH (AUSTRALIAN SPECS)
FIGURE 7-33. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITHOUT AC CABLE/WITH FOOTSWITCH
FIGURE 7-34. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITH FOOTSWITCH
FIGURE 7-35. LIFT DOWN HARNESS (WITH LSS)
FIGURE 7-36. PLATFORM CONTROL BOX HARNESS
FIGURE 7-37. RECEPTACLE BOX KIT - 110V GFI
FIGURE 7-38. RECEPTACLE BOX KIT - 110V IEC YELLOW (CE SPEC)
FIGURE 7-39. RECEPTACLE BOX KIT - 220V IEC BLUE (CE SPEC)
FIGURE 7-40. RECEPTACLE BOX KIT - 220V CEE7 POST GROUND (CE SPEC)
FIGURE 7-41. RECEPTACLE BOX KIT - 220V CEE7 SIDE GROUND (CE SPEC)
FIGURE 7-42. RECEPTACLE BOX KIT - 220V AFSINT 107 (CE SPEC)
FIGURE 7-43. INVERTER INSTALLATION
FIGURE 7-44. HARNESS, AC EXTENSION
FIGURE 7-45. HARNESS, INVERTER
SECTION 8 - DECALSFIGURE 8-1. DECAL INSTALLATION (ANSI SPECS)
FIGURE 8-2. DECAL INSTALLATION (AUSTRALIAN SPECS)
FIGURE 8-3. DECAL INSTALLATION (CE SPECS)
FIGURE 8-4. DECAL INSTALLATION (CHINA SPECS)
FIGURE 8-5. DECAL INSTALLATION (CSA SPECS)
FIGURE 8-6. DECAL INSTALLATION (JAPANESE SPECS)
FIGURE 8-7. DECAL INSTALLATION (KOREAN SPECS)
FIGURE 8-8. DECAL INSTALLATION - OPTIONS
SECTION 9 - RECOMMENDED SERVICE PARTS STOCKFIGURE 9-1. RECOMMENDED SERVICE PARTS STOCK
SECTION 10 - SPECIAL OPTIONSFIGURE 10-1. SPECIAL OPTIONS
PART NUMBER INDEX
More the random threads same category:
- Skytrak (JLG) Telehandlers Parts Manual
- SuperPac Parts Manual
- StratoLift Parts Manual
- JLG Toucan Duo 13MSPT Operators Service & Parts Manuals
- JLG Telehandler 1055 1255 (PVC 1911) Operation, Service & Parts Manuals
- JLG Scissor Lift RS Series Operation, Service & Parts Manuals
- JLG Telehandler G10-55A G12-55A Operation, Service & Parts Manuals
- JLG Telehandler 4017 Operation, Service & Parts Manuals
- JLG Telehandler 742 (PVC 1911) Operation, Service & Parts Manuals
- JLG Telehandler 3614RS 4017RS Operation, Service & Parts Manuals
- JLG UTV 315G Operator, Service & Parts Manuals
- JLG SkyTrak TeleHandler MMV Operation, Service & Parts Manuals
- JLG Scissor Lift R6 R10 Operation, Service & Parts Manuals
- JLG-Deutz Fahr Agrovector 40.8 40.9 Operators Service & Parts Manuals
- JLG Telehandler 925, 832 (PVC 1911) Operation, Service & Parts Manuals