Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Scissor Lift ES1330L ES1330M Parts Catalog 3122326200

#1
Download this document, you need 2725 Gallons
Download Now
JLG Scissor Lift ES1330L ES1330M Parts Catalog 3122326200
Size: 20.42 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Scissor Lift
Type of Manual: Parts Catalog
Model: JLG ES1330L ES1330M Scissor Lift
Part Number: 3122326200
Publication Date: 2025
Number of Pages: 290 Pages

Contents:
SECTION 1 - FRAME
FIGURE 1-1. STEER INSTALLATION (MACHINES WITH SNS STARTING WITH M2)​
FIGURE 1-2. STEER INSTALLATION (Prior to SN B200099929, SN B200100071 through B200100074, SN B200100546 through B200100548)​
FIGURE 1-3. STEER INSTALLATION (SN B200099929 to Present, Except SN B200100071 through B2000100074, Except SN B2000100546 through B200100548)​
FIGURE 1-4. DRIVE COMPONENTS INSTALLATION (FAIRFIELD)​
FIGURE 1-5. DRIVE MOTOR ASSEMBLY (FAIRFIELD) (RH)​
FIGURE 1-6. DRIVE MOTOR ASSEMBLY (FAIRFIELD) (LH)​
FIGURE 1-7. TIRE/WHEEL INSTALLATION​
FIGURE 1-8. POTHOLE PROTECTION SYSTEM INSTALLATION (ALL SPECS EXCEPT CE)​
FIGURE 1-9. POTHOLE PROTECTION SYSTEM INSTALLATION (CE SPEC) (EARLY VERSION - STRAIGHT BARS)​
FIGURE 1-10. POTHOLE PROTECTION SYSTEM INSTALLATION (CE SPEC) (LATE VERSION - BARS WITH STEP-DOWN DESIGN AT FRONT)​
FIGURE 1-11. TILT SENSOR INSTALLATION​
FIGURE 1-12. BATTERY CHARGER INSTALLATION (SMART CHARGER)​
FIGURE 1-13. BATTERY CHARGER INSTALLATION (GREENPOWER)​
FIGURE 1-14. BEACON/STROBE LIGHT INSTALLATION - SINGLE (WITHOUT CLEARSKY BEACON)​
FIGURE 1-15. BEACON/STROBE LIGHT INSTALLATION - DUAL (WITHOUT CLEARSKY BEACON)​
FIGURE 1-16. BEACON/STROBE LIGHT INSTALLATION - SECOND (WITH CLEARSKY BEACON)​
FIGURE 1-17. ALARM INSTALLATION (AMBIENT/WHITE NOISE)​
FIGURE 1-18. LADDER INSTALLATION​
FIGURE 1-19. FRAME COVER INSTALLATION​
SECTION 2 - GROUND CONTROLS
FIGURE 2-1. HYDRAULIC COMPONENT INSTALLATION (PMT B/R MODEL R930071233)​
FIGURE 2-2. HYDRAULIC COMPONENT INSTALLATION (PMT B/R MODEL R930095807)​
FIGURE 2-3. HYDRAULIC COMPONENT INSTALLATION (PMT VIBO BRAND)​
FIGURE 2-4. PUMP/MOTOR/TANK ASSEMBLY (B/R MODEL R930071233)​
FIGURE 2-5. PUMP/MOTOR/TANK ASSEMBLY (B/R MODEL R930095807)​
FIGURE 2-6. PUMP/MOTOR/TANK ASSEMBLY (VIBO BRAND)​
FIGURE 2-7. LEAK CONTAINMENT INSTALLATION​
FIGURE 2-8. ELECTRICAL COMPONENTS INSTALLATION (WITH LSS)​
FIGURE 2-9. MDI INSTALLATION​
FIGURE 2-10. BATTERIES INSTALLATION - STANDARD BATTERIES WITHOUT DISCONNECT​
FIGURE 2-11. BATTERIES INSTALLATION - STANDARD BATTERIES WITH DISCONNECT​
FIGURE 2-12. BATTERIES INSTALLATION - AGM BATTERIES WITHOUT DISCONNECT​
FIGURE 2-13. BATTERIES INSTALLATION - AGM VISION BATTERIES WITHOUT DISCONNECT​
FIGURE 2-14. BATTERIES INSTALLATION - AGM BATTERIES WITH DISCONNECT​
FIGURE 2-15. BATTERIES INSTALLATION - AGM VISION BATTERIES WITH DISCONNECT​
FIGURE 2-16. BATTERIES INSTALLATION - LITHIUM​
FIGURE 2-17. DOORS INSTALLATION​
SECTION 3 - SCISSOR ARMS
FIGURE 3-1. SCISSOR ARMS INSTALLATION (WITH LSS) (MACHINES WITH SN STARTING WITH M2)​
FIGURE 3-2. SCISSOR ARMS INSTALLATION (WITH LSS) (Prior to SN B200099929, SN B200100071 through B200100074, SN B200100546 through B200100548)​
FIGURE 3-3. SCISSOR ARMS INSTALLATION (WITH LSS) (SN B200099929 to Present, Except SN B200100071 through B200100074, Except SN B200100546 through B200100548)​
SECTION 4 - PLATFORM
FIGURE 4-1. PLATFORM INSTALLATION (MACHINES WITH SNS STARTING WITH M2)​
FIGURE 4-2. PLATFORM INSTALLATION (Prior to SN B200099929, SN B200100071 through B200100074, SN B200100546 through B200100548)​
FIGURE 4-3. PLATFORM INSTALLATION (SN B200099929 to Present, Except SN B200100071 through B200100074, Except SN B200100546 through B200100548)​
FIGURE 4-4. PLATFORM EXTENSION INSTALLATION​
FIGURE 4-5. RAILS INSTALLATION (1.0M TUBE IN TUBE)​
FIGURE 4-6. RAILS INSTALLATION (1.1M TUBE IN TUBE)​
FIGURE 4-7. RAILS INSTALLATION (SIDE BY SIDE) (Prior to SN B200102925, Prior to SN M200110013)​
FIGURE 4-8. RAILS INSTALLATION (SIDE BY SIDE) (SN B200102925 to Present, SN M200110013 to Present)​
FIGURE 4-9. GATE LATCH INSTALLATION​
FIGURE 4-10. PLATFORM CONSOLE INSTALLATION (ALL SPECS)​
FIGURE 4-11. PLATFORM CONTROL PLUG INSTALLATION​
FIGURE 4-12. PIPE RACKS INSTALLATION (CE & UK CA SPECS)​
SECTION 5 - CYLINDER
FIGURE 5-1. LIFT CYLINDER ASSEMBLY​
FIGURE 5-2. STEER CYLINDER ASSEMBLY​
SECTION 6 - HYDRAULIC
FIGURE 6-1. HYDRAULIC DIAGRAM (PMT B/R MODEL R930071233)​
FIGURE 6-2. HYDRAULIC DIAGRAM (PMT B/R MODEL R930095807)​
FIGURE 6-3. HYDRAULIC DIAGRAM (PMT VIBO BRAND)​
SECTION 7 - ELECTRICAL
FIGURE 7-1. AC BOX AT PLATFORM INSTALLATION - 110V GFI (ALL SPECS EXCEPT CE & UK CA SPECS)​
FIGURE 7-2. AC BOX AT PLATFORM INSTALLATION - 110V IEC YELLOW (CE & UK CA SPECS)​
FIGURE 7-3. AC BOX AT PLATFORM INSTALLATION - 220V IEC BLUE (CE & UK CA SPECS)​
FIGURE 7-4. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 POST GROUND (CE & UK CA SPECS)​
FIGURE 7-5. AC BOX AT PLATFORM INSTALLATION - 220V CEE7 SIDE GROUND (CE & UK CA SPECS)​
FIGURE 7-6. AC BOX AT PLATFORM INSTALLATION - 220V AFSINT 107 (CE & UK CA SPECS)​
FIGURE 7-7. AC BOX AT PLATFORM INSTALLATION - 220V AUSTRALIAN PLUG (AUSTRALIAN SPECS)​
FIGURE 7-8. AC BOX AT PLATFORM INSTALLATION - 220V CHINA PLUG (CHINA SPECS)​
FIGURE 7-9. AC BOX AT PLATFORM INSTALLATION - 220V LOCALLY SUPPLIED​
FIGURE 7-10. BREAKER BOX KIT WITH 1 DOUBLE BREAKER (AUSTRALIAN SPECS)​
FIGURE 7-11. BREAKER BOX KIT WITH 1 DOUBLE BREAKER (CE & UK CA SPECS)​
FIGURE 7-12. BREAKER BOX KIT WITH 3 BREAKER​
FIGURE 7-13. CHARGER HARNESS​
FIGURE 7-14. CHARGER PLUG INSTALLATION (DELTA-Q CHARGER) (LOCALLY SUPPLIED PLUG) (ALL SPECS EXCEPT ANSI & AUSTRALIAN SPECS)​
FIGURE 7-15. CHARGER PLUG INSTALLATION (GREEN POWER CHARGER) (LOCALLY SUPPLIED PLUG) (ALL SPECS EXCEPT ANSI & AUSTRALIAN SPECS)​
FIGURE 7-16. CHARGER PLUG INSTALLATION (110V PLUG) (ANSI & CSA SPECS)​
FIGURE 7-17. CHARGER PLUG INSTALLATION (AUSTRALIAN PLUG) (AUSTRALIAN SPECS)​
FIGURE 7-18. CHARGER PLUG INSTALLATION (110V IEC YELLOW PLUG) (CE & UK CA SPECS)​
FIGURE 7-19. CHARGER PLUG INSTALLATION (220V IEC BLUE PLUG) (CE & UK CA SPECS)​
FIGURE 7-20. CHARGER PLUG INSTALLATION (220V CEE7 PLUG) (CE & UK CA SPECS)​
FIGURE 7-21. CHARGER PLUG INSTALLATION (220V AFSINT107 PLUG) (CE & UK CA SPECS)​
FIGURE 7-22. CHARGER PLUG INSTALLATION (CHINA PLUG) (DELTA-Q CHARGER) (CHINA SPECS)​
FIGURE 7-23. CHARGER PLUG INSTALLATION (CHINA PLUG) (GREEN POWER CHARGER) (CHINA SPECS)​
FIGURE 7-24. CHARGER PLUG INSTALLATION (KOREAN PLUG) (KOREAN SPECS)​
FIGURE 7-25. CHASSIS HARNESS (WITH LSS)​
FIGURE 7-26. CLEARSKY CS550 BEACON INSTALLATION​
FIGURE 7-27. CLEARSKY INSTALLATION (WITH SHIELD) - SMART FLEET​
FIGURE 7-28. DRIVE CONTROL HARNESS​
FIGURE 7-29. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITHOUT AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 7-30. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 7-31. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH (AUSTRALIAN SPECS)​
FIGURE 7-32. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITHOUT AC CABLE/WITH FOOTSWITCH​
FIGURE 7-33. GROUND TO PLATFORM CABLE INSTALLATION - WITHOUT PLATFORM COIL CABLE/WITH AC CABLE/WITH FOOTSWITCH​
FIGURE 7-34. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITHOUT AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 7-35. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH​
FIGURE 7-36. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITHOUT FOOTSWITCH (AUSTRALIAN SPECS)​
FIGURE 7-37. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITHOUT AC CABLE/WITH FOOTSWITCH​
FIGURE 7-38. GROUND TO PLATFORM CABLE INSTALLATION - WITH PLATFORM COIL CABLE/WITH AC CABLE/WITH FOOTSWITCH​
FIGURE 7-39. HARNESS, AC EXTENSION​
FIGURE 7-40. INVERTER INSTALLATION (STANDARD AND AGM BATTERIES)​
FIGURE 7-41. INVERTER INSTALLATION (WITH LITHIUM BATTERIES)​
FIGURE 7-42. INVERTER HARNESS (STANDARD AND AGM BATTERIES)​
FIGURE 7-43. INVERTER HARNESS (LITHIUM BATTERIES)​
FIGURE 7-44. LIFT DOWN HARNESS (WITH LSS)​
FIGURE 7-45. LIFT DOWN HARNESS (WITH LSS)​
FIGURE 7-46. LITHIUM BATTERY HARNESS​
FIGURE 7-47. PLATFORM CONTROL BOX HARNESS​
FIGURE 7-48. RECEPTACLE BOX KIT - 110V GFI​
FIGURE 7-49. RECEPTACLE BOX KIT - 110V IEC YELLOW (CE & UK CA SPEC)​
FIGURE 7-50. RECEPTACLE BOX KIT - 220V IEC BLUE (CE & UK CA SPEC)​
FIGURE 7-51. RECEPTACLE BOX KIT - 220V CEE7 POST GROUND (CE & UK CA SPEC)​
FIGURE 7-52. RECEPTACLE BOX KIT - 220V CEE7 SIDE GROUND (CE & UK CA SPEC)​
FIGURE 7-53. RECEPTACLE BOX KIT - 220V AFSINT 107 (CE & UK CA SPEC)​
SECTION 8 - DECALS
FIGURE 8-1. DECAL INSTALLATION (ANSI SPECS)​
FIGURE 8-2. DECAL INSTALLATION (AUSTRALIAN SPECS)​
FIGURE 8-3. DECAL INSTALLATION (CE & UK CA SPECS)​
FIGURE 8-4. DECAL INSTALLATION (CHINA SPECS)​
FIGURE 8-5. DECAL INSTALLATION (CSA SPECS)​
FIGURE 8-6. DECAL INSTALLATION (KOREAN SPECS)​
FIGURE 8-7. DECAL INSTALLATION - OPTIONS​
SECTION 9 - RECOMMENDED SERVICE PARTS STOCK
FIGURE 9-1. RECOMMENDED SERVICE PARTS STOCK​
SECTION 10 - SPECIAL OPTIONS/ACCESSORIES/KITS
FIGURE 10-1. SPECIAL OPTIONS/ACCESSORIES/KITS​
PART NUMBER INDEX


 
Top