JLG Boom Lift H340AJ Service & Maintenance Manual 3122567800 2026
- Download this document, you need 2725 Gallons
JLG Boom Lift H340AJ Service & Maintenance Manual 3122567800 2026
Size: 77.44 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG H340AJ Boom Lift
Part Number: 3122567800
Publication Date: 2026
Number of Pages: 714 Pages
Contents:
Safety
Size: 77.44 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG H340AJ Boom Lift
Part Number: 3122567800
Publication Date: 2026
Number of Pages: 714 Pages
Contents:
Safety
General
1.1.1 Disclaimer
1.1.2 Operation & Safety Manual
Safety Information
1.2.1 Safety Alert System and Signal Words
Safety Hazards
1.3.1 Personal Hazards
1.3.2 Equipment Hazards
1.3.3 General Hazards
1.3.4 Operational Hazards
Safety Decals
Machine Verification
General Machine Information and SpecificationsSpecifications
2.1.1 Machine Specifications
2.1.2 Dimensional Data
2.1.3 Tires
2.1.4 Engine Data
2.1.5 Major Component Weights
Machine Temperature Chart
Serial Number Location
Fluids and Lubrication
2.4.1 General Information
2.4.2 Hydraulic Oil
2.4.3 Changing Hydraulic Oil
2.4.4 Lubrication Specifications
2.4.5 Fluids
2.4.6 Capacities
2.4.7 Lubrication Schedule
Machine Characteristics
2.5.1 Platform Control Enable System
2.5.2 Transport Position Sensing System
2.5.3 Beyond Transport Position - Drive Speed Cutback System
2.5.4 Platform Load Sensing System
2.5.5 Jib Lift End of Stroke Dampening
2.5.6 Ground Control Keyswitch System
2.5.7 Side Entry Platform
2.5.8 Function Speed Control System
2.5.9 Emergency Decent System
2.5.10 Oscillating Axle System
2.5.11 Drive System
2.5.12 Drive Orientation System
2.5.13 Chassis Tilt Indicator System
2.5.14 Fuel Reserve / Cut-Out System
2.5.15 Hot Weather operation
2.5.16 Cold Weather Operation
Clearsky Smart Fleet (If Equipped)
2.6.1 General
2.6.2 ClearSky Smart Fleet™ — Access Control
Maintenance and Inspection SchedulesMachine Preparation, Inspection, and Maintenance
3.1.1 General
3.1.2 Preparation, Inspection, and Maintenance
3.1.3 Pre-Start Inspection
3.1.4 Pre-Delivery Inspection and Frequent Inspection
3.1.5 Annual Machine Inspection
3.1.6 Preventive Maintenance
Service and Guidelines
3.2.1 General
3.2.2 Safety and Workmanship
3.2.3 Cleanliness
3.2.4 Components Removal and Installation
3.2.5 Component Disassembly and Reassembly
3.2.6 Pressure-Fit Parts
3.2.7 Bearings
3.2.8 Gaskets
3.2.9 Bolt Usage and Torque Application
3.2.10 Hydraulic Lines and Electrical Wiring
3.2.11 Hydraulic System
3.2.12 Lubrication
3.2.13 Battery
3.2.14 Welding on JLG Equipment
Preventive Maintenance and Inspection Schedule
3.3.1 Daily
3.3.2 First 50 Hours
3.3.3 Every 150 Hours or 3 Months
3.3.4 First 300 Hours or 6 Months
3.3.5 Every 600 Hours or 1 Year
3.3.6 Every 1000 Hours or 2 Year
3.3.7 Every 1200 Hours or 2 Year
Pins and Composite Bearing Repair Guidelines
Tires and Wheels
3.5.1 Tire Inflation
3.5.2 Tire Damage
Fuel Tank Inspection
Boom Inspection and Maintenance
3.7.1 Boom Cleanliness Guidelines
Hydraulic Filter Replacement
3.8.1 Hydraulic Filter Removal
3.8.2 Hydraulic Filter Installation
Turntable Bearing Inspection
3.9.1 Turntable Bearing Mounting Bolt Condition Check
3.9.2 Wear Tolerance
3.9.3 Swing Bearing Torque Value
Engine General Inspection
3.10.1 Retrieving Engine Hours
3.10.2 Fuel Level Sensor
3.10.3 Coolant Sensor
3.10.4 Engine Oil Pressure Switch
3.10.5 Glow Plugs
3.10.6 Engine Oil Operation Chart
3.10.7 Replacing Oil Filter
3.10.8 Replacing Primary Fuel Filter
3.10.9 Engine Operating States
Battery Maintenance, Quarterly (task)
Testing, Calibrations and Special ProceduresSpecial Tools
4.1.1 Multimeter Basics
4.1.2 Threadlocking Compound
4.1.3 Tools Catalog
Testing Procedures
4.2.1 Starter
4.2.2 SkyGuard
4.2.3 LSS Testing and Evaluation
4.2.4 System Test
Calibration Procedures
4.3.1 JLG Analyzer
4.3.2 Calibration Preparation
4.3.3 Load Sensing System Calibration
4.3.4 Calibrating Steer
4.3.5 Calibrating Tilt Sensor
Special Procedures
4.4.1 Fuel Tank Cleaning and Drying
4.4.2 Cylinder Drift
4.4.3 Hydraulic Circuits
4.4.4 Oscillating Axle Bleeding Procedure and Lockout Test
4.4.5 Oil Sampling
System SoftwareLoad Sensing System (LSS)
5.1.1 Theory of Operation
5.1.2 Load Sensing Gauge Removal/ Installation
JLG Analyzer
5.2.1 Machine Data Access
5.2.2 Hand Held Analyzer
5.2.3 Analyzer Flow Chart
Analyzer Software Accessibility
5.3.1 Machine Set-Up
5.3.2 Personalities
Machine Orientation When Setting Function Speeds
5.4.1 Drive (Below Elevation):
5.4.2 Drive (Above Elevation):
5.4.3 Swing:
5.4.4 Tower Lift:
5.4.5 Main Lift:
5.4.6 Telescope:
5.4.7 Jib Lift:
5.4.8 Platform Rotate:
5.4.9 Test Notes
CANBUS Communications
ClearSky (CS550) Configuration and Troubleshooting
5.6.1 ClearSky Smart FleetTM CS550 Configuration
5.6.2 Troubleshooting
Fault CodesFault Codes Introduction
Machine Fault Codes
6.2.1 General
6.2.2 LSS Troubleshooting
6.2.3 ClearSky Smart Fleet DTC Fault Codes
6.2.4 System Test Messages
ClearSky CS550 Troubleshooting Procedures
Machine Diagnostics Parameters
HydraulicsGeneral Information and Safety
Theories of Operation
7.2.1 Cylinders
7.2.2 Valves
Hydraulic Components
7.3.1 Hydraulic Oil Tank
7.3.2 Pressure Setting Procedure
Torque Values
7.4.1 Main Control Valve Torque Specifications
Hydraulic System
ElectricalsGeneral Information
8.1.1 Applying Silicone Dielectric Compound to Electrical Connections
8.1.2 Dielectric Grease Application
Electrical Connectors
8.2.1 Deutsch Connectors
Electrical Component Terminology
Harness Layouts
Board Layouts
8.5.1 Ground Control Module Pin Connections
8.5.2 Genset Control Module Pin Connections
8.5.3 Platform Control Module Pin Connections
8.5.4 Traction Control Module Pin Connections
AMP Connector
8.6.1 Assembly
8.6.2 Disassembly
8.6.3 Wedge Lock
8.6.4 Service - Voltage Reading
Wiring Harness and Connector Label Diagrams
8.7.1 Connector Labels
8.7.2 Component Labels
Electrical Installation
Battery Disconnect Switch
8.9.1 Function Check
8.9.2 Batteries
Operator Controls and Switches
8.10.1 Ground Control Switches
8.10.2 Platform Control Switches
8.10.3 Control System Boom Switches
Ferrite Beads
Battery Charger
8.12.1 Indications on the Charger 3-LED Display
8.12.2 Troubleshooting Instructions
8.12.3 Instructions for using the Delta-Q QuiQ Programmer CT QuiQ Programming Kit
8.12.4 Connecting a QuiQ Charger to your Computer
8.12.5 Starting QuiQ Programmer CT
8.12.6 Programming Delta-Q QuiQ and QuiQ-dci Chargers
8.12.7 View Charge Tracking Data with QuiQ Programmer CT
8.12.8 Selecting a Charge Profile
8.12.9 Battery Testing
Removal and InstallationWheel and Tire
9.1.1 Tire Replacement
9.1.2 Wheel and Tire Replacement
9.1.3 Removing Wheel and Tire Assembly from Machine
9.1.4 Wheel Installation
Chassis/Frame Assembly
9.2.1 Axle and Drive Assemblies Troubleshooting
9.2.2 Axle Assembly
9.2.3 Spindle Assembly
9.2.4 Drive Motor
9.2.5 Drive Hub
Boom
9.3.1 Boom Components Terminology
9.3.2 Main Boom Powertrack
9.3.3 Boom
9.3.4 Jib and Rotator Assembly
Platform
9.4.1 Platform (Rapid Replaceable Platform)
9.4.2 Platform Support (Traditional Design)
9.4.3 Platform Support (Rapid Replaceable Platform)
Engine
9.5.1 Component Terminology
9.5.2 Engine Serial Number
9.5.3 Engine Replacement
9.5.4 Coolant Overflow Tank (Kubota Engine)
9.5.5 Air Filter Assembly
9.5.6 Radiator Assembly
9.5.7 Starter
9.5.8 Alternator
9.5.9 Fuel Tank
Transmission
Hydraulic Cylinders
9.7.1 Main Boom Lift Cylinder
9.7.2 Main Boom Telescope Cylinder
9.7.3 Tower Boom Lift Cylinder
9.7.4 Master Cylinder
9.7.5 Platform Level Cylinder
9.7.6 Articulating Jib and Jib Lift Cylinder
9.7.7 Steer Cylinder
9.7.8 Axle Lockout Cylinder
Hydraulic Valves
9.8.1 Valve Installation
Hydraulic Pumps
9.9.1 Function Pump
Electrical Components
9.10.1 Battery
Turntable
9.11.1 Swing Bearing
9.11.2 Counterweight
9.11.3 Swing Motor
Generator
9.12.1 Generator - Kubota Engine
ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)
9.13.1 ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)
Disassembly and AssemblyDrive Assembly
10.1.1 Drive Hub
10.1.2 Drive Motor
Boom and Jib Assembly
10.2.1 Main Boom Disassembly/Assembly
10.2.2 Jib Disassembly/Assembly
10.2.3 Rotary Actuator
Engine Components
10.3.1 Engine Disassembly, Inspection and Service
10.3.2 Fuel Tank
Hydraulic Cylinders
10.4.1 Disassembly and Assembly Instructions
10.4.2 General Information
10.4.3 Standard of Maintenance
10.4.4 Inspection After Assembly
10.4.5 Disassembly Procedure
10.4.6 Assembly
10.4.7 Tower Lift Cylinder
10.4.8 Main Lift Cylinder
10.4.9 Master Cylinder
10.4.10 Platform Level Cylinder
10.4.11 Jib Lift Cylinder
10.4.12 Steer Cylinder
10.4.13 Telescope Cylinder
10.4.14 Axle Lockout Cylinder
Turntable
10.5.1 Swing Motor
10.5.2 Swing Bearing
Generator Disassembly and Assembly
10.6.1 Ball Bearing Repair/Replacement
Powertrack
10.7.1 Remove Link
10.7.2 Install New Link
10.7.3 Replace Fixed End Brackets
10.7.4 Replace Moving End Brackets
Torque/Connection InformationHydraulic Fittings
11.1.1 Tapered Thread Types
11.1.2 Straight Thread Types, Tube and Hose Connections
11.1.3 Straight Thread Types, Port Connections
11.1.4 Flange Connection Types
11.1.5 Tightening Methods
11.1.6 Assembly and Torque Specifications
11.1.7 General Tube Type Fitting Assembly Instructions
11.1.8 Assembly Instructions for American Standard Pipe Thread Tapered Connections.
11.1.9 Assembly Instructions for British Standard Pipe Thread Tapered Connections
11.1.10 Assembly Instructions for 37° (JIC) Flare Fittings
11.1.11 Assembly Instructions for 45° SAE Flare Fittings
11.1.12 Assembly Instructions for O-Ring Face Seal (ORFS) Fittings
11.1.13 Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)
11.1.14 Assembly Instructions for Bulkhead (BH) Fittings
11.1.15 Assembly Instructions for O-Ring Boss (ORB) Fittings
11.1.16 Assembly Instructions for Adjustable Port End Metric Fittings
11.1.17 Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Ends
11.1.18 Assembly instructions for Adjustable Port End (BSPP) Fittings
11.1.19 Assembly Instructions for Flange Connections: (FL61 and FL62)
11.1.20 Double Wrench Method
11.1.21 FFWR and TFFT Methods
11.1.22 Adjustable Stud End Assembly
11.1.23 O-ring Installation (Replacement)
Torque Charts
11.2.1 SAE Fastener Torque Chart
11.2.2 Metric Fastener Torque Chart
SchematicsHydraulic Schematics
Electrical Schematics
More the random threads same category:
- Skytrak (JLG) Telehandlers Parts Manual
- SuperPac Parts Manual
- StratoLift Parts Manual
- JLG Toucan Duo 13MSPT Operators Service & Parts Manuals
- JLG Telehandler 1055 1255 (PVC 1911) Operation, Service & Parts Manuals
- JLG Scissor Lift RS Series Operation, Service & Parts Manuals
- JLG Telehandler G10-55A G12-55A Operation, Service & Parts Manuals
- JLG Telehandler 4017 Operation, Service & Parts Manuals
- JLG Telehandler 742 (PVC 1911) Operation, Service & Parts Manuals
- JLG Telehandler 3614RS 4017RS Operation, Service & Parts Manuals
- JLG UTV 315G Operator, Service & Parts Manuals
- JLG SkyTrak TeleHandler MMV Operation, Service & Parts Manuals
- JLG Scissor Lift R6 R10 Operation, Service & Parts Manuals
- JLG-Deutz Fahr Agrovector 40.8 40.9 Operators Service & Parts Manuals
- JLG Telehandler 925, 832 (PVC 1911) Operation, Service & Parts Manuals