Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Boom Lift 20AM 25AM 30AM 36AM 41AM Service & Maintenance Manual 3120752 2025

#1
Download this document, you need 2725 Gallons
Download Now
JLG Boom Lift 20AM 25AM 30AM 36AM 41AM Service & Maintenance Manual 3120752 2025
Size: 3.68 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
SN 0900000001-0900038985
Model: JLG 20AM 25AM 30AM 36AM 41AM Boom Lift
Part Number: 3120752
Publication Date: 2025
Number of Pages: 84 Pages

Contents:
INTRODUCTION - operation/safety precautions
INTRODUCTION - Maintenance safety precautions
General​
Hydraulic System Safety​
Maintenance Safety​
Effectivity Changes
TABLE OF CONTENTS
Section 1. specifications
1.1 Capacities​
Hydraulic Oil Reservoir​
1.2 Component Data​
Hydraulic Pump/Electric Motor Assembly​
Batteries (1) – DC Models​
Battery Charger – DC Models​
1.3 Performance Data​
Platform Capacity​
Platform Cycle Performance​
Machine Weight (with Standard Platform)​
Machine Height (Platform Stowed)​
Maximum Platform Height (Mast Extended)​
Maximum Working Height (Average Person)​
Machine Overall Width and Length (Base)​
Outrigger Footprint​
Outrigger Machine Leveling Capability​
1.4 Torque Requirements​
1.5 Lubrication​
Hydraulic Oil (HO)​
1.6 Hydraulic Pressure Adjustment​
1.7 Cylinder Specifications​
1.8 Serial Number Locations​
Section 2. SERVICE PROCEDURES
2.1 MACHINE PREPARATION, INSPECTION, AND MAINTENANCE​
General​
Preparation, Inspection, and Maintenance​
Pre-Start Inspection​
Pre-Delivery Inspection and Frequent Inspection​
Annual Machine Inspection​
Preventative Maintenance​
2.2 Preventive Maintenance and Inspection Schedule​
2.3 Servicing and Maintenance Guidelines​
General​
Safety and Workmanship​
Cleanliness​
Components Removal and Installation​
Component Disassembly and Reassembly​
Pressure-Fit Parts​
Bearings​
Gaskets​
Bolt Usage and Torque Application​
Hydraulic Lines and Electrical Wiring​
Hydraulic System​
Lubrication and Servicing​
Batteries​
Mast Chain Inspection Procedure​
Mast Cable Inspection Procedure​
2.4 Lubrication Information​
Hydraulic System​
Hydraulic Oil​
Changing Hydraulic Oil​
Lubrication Specifications​
2.5 Battery Charger - Assembly and Disassembly​
General Information​
Battery Charger Removal​
Cover Removal​
Transformer Replacement​
Printed Circuit Board Replacement​
DC Circuit Breaker Replacement​
AC Circuit Breaker and Voltage Selection Switch Replacement​
Shunt Assembly, Varistor, and SCR Rectifier Replacement (See Illustration)​
2.6 hydraulic LIFT pump - servicing​
FENNER BRAND PUMP - Brush Replacement​
Motor Cap/Motor Installation​
Motor Brush Installation​
Brush Housing Final Assembly Tips​
MONARCH BRAND PUMP - Brush Replacement​
Motor Assembly - Remove/Install - Reference Marks​
Motor/Brush Cover - Remove/Install​
Brush Carrier Assembly - Remove/Install​
Brush Assembly - Remove/Install​
TANK AND PUMP REMOVAL - (All Pumps)​
Tank Installation​
Filter Screen Installation​
Pump Installation​
Pressure Adjust Valve Installation​
Pressure Check Valve Installation​
2.7 Hydraulic Lift Cylinder - Removal, Inspection and rebuild​
Cylinder Removal​
Cylinder Disassembly​
Lift Cylinder Component Inspection​
Cylinder Assembly​
Installation​
2.8 Mast Assembly And Disassembly Procedures​
Mast Disassembly Procedure​
Platform Section Removal (All Masts)​
Mast Section 6 Removal (7 Section Mast)​
Mast Section 5 Removal (6 & 7 Section Mast)​
Mast Section 4 Removal (All Masts)​
Mast Section 3 Removal (All Masts)​
Mast Section 2 Removal (All Masts)​
Mast Section 1 Disassembly (All Masts)​
2.9 Mast Assembly​
Mast Section 1 - Assembly (All Masts)​
Mast Section 2 - Assembly (All Masts)​
Mast Section 3 - Assembly (All Masts)​
Mast Section 4 - Assembly (All Masts)​
Mast Section 5 - Assembly (25/30/36/41 ft. Masts)​
Mast Section 6 - Assembly (30/41 ft. Masts)​
Platform Mounting Section - Assy. (All Masts)​
2.10 Mast To Base Frame Installation​
2.11 MAST CHAINS/CABLES AND SEQUENCING CABLES ADJUSTMENT​
Mast Chain/Cable Adjustment​
Sequencing Cable Adjustment​
2.12 Sequence Cable replacement kit​
Remove Old Cable​
Replacement Cable Installation​
Clamp Installation (Drum/Socket Type)​
Section 3. troubleshooting
3.1 General​
3.2 Troubleshooting Information​
3.3 Hydraulic Circuit Checks​
3.4 ELECTRICAL SYSTEM - MULTIMETER BASICS​
Grounding​
Backprobing​
Min/Max​
Polarity​
Scale​
Continuity Measurement Over Long Distances​
Requirements:​
Procedure​
3.5 ELECTRICAL SWITCH TESTING​
Basic Check​
Limit Switches​
Automatic Switches​
Switch Wiring - Low Side, High Side​
3.6 Outrigger Interlock Contacts​
Outrigger Socket and Outrigger Beam - Interlock Contacts​
Outrigger Socket - Contactor Screw Mounting Instructions​
Outrigger Beam - Interlock Contactor Plate Mounting Instructions​
Detent Screws​



 
Top