Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,834

JLG Boom Lift 1250AJP Service & Maintenance Manual 3122562500 2026

#1
Download this document, you need 2725 Gallons
Download Now
JLG Boom Lift 1250AJP Service & Maintenance Manual 3122562500 2026
Size: 85.26 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1250AJP Boom Lift
Part Number: 3122562500
Publication Date: 2026
Number of Pages: 940 Pages

Contents:
Safety
General​
1.1.1 Disclaimer​
1.1.2 Operation & Safety Manual​
Safety Information​
1.2.1 Safety Alert System and Signal Words​
Safety Hazards​
1.3.1 Personal Hazards​
1.3.2 Equipment Hazards​
1.3.3 General Hazards​
1.3.4 Operational Hazards​
Safety Decals​
Machine Verification​
General Machine Information and Specifications
Specifications​
2.1.1 Machine Specification​
2.1.2 Machine Dimensional Data​
2.1.3 Engine Data​
2.1.4 Chassis Specifications​
2.1.5 Tires​
2.1.6 Torque Requirements​
2.1.7 Pressure Settings​
2.1.8 Major Component Weights​
Machine Temperature Chart​
Serial Number Location​
Fluids and Lubrication​
2.4.1 General Information​
2.4.2 Hydraulic Oil​
2.4.3 Changing Hydraulic Oil​
2.4.4 Lubrication Specifications​
2.4.5 Fluids​
2.4.6 Capacities​
2.4.7 Lubrication Schedule​
Machine Characteristics​
2.5.1 Axle Extension System​
2.5.2 Oscillating Axle System​
2.5.3 Swing Speed Proportioning​
2.5.4 HRC Engine Emission Characteristics​
2.5.5 Diesel Particulate Filter (If Equipped)​
2.5.6 Electronic Platform Leveling​
2.5.7 Drive System​
2.5.8 Steering Control System​
2.5.9 Drive/Steering Speed Control​
2.5.10 Traction Control System​
2.5.11 Drive Orientation System​
2.5.12 Chassis Tilt Indicator System​
2.5.13 Auxiliary Power System​
2.5.14 Platform Control Enable System​
2.5.15 Transport Position Sensing System​
2.5.16 Beyond Transport - Drive Speed Cutback System​
2.5.17 Drive/Steer – Boom Function Interlock System (CE/UKCA ONLY)​
2.5.18 Jib Stow System​
2.5.19 Envelope Control System​
2.5.20 Tower Path Control System​
2.5.21 Automatic Main Boom Control System​
2.5.22 Electrical Retrieval System​
2.5.23 Hydraulic Retrieval System​
2.5.24 Controlled Boom Angle System​
2.5.25 Slow Down System​
2.5.26 Dual Capacity System​
2.5.27 Hydraulic System Warm Up​
2.5.28 Reduced Platform Heights​
Clearsky Smart Fleet (If Equipped)​
2.6.1 General​
2.6.2 ClearSky Smart Fleet™ — Access Control​
Maintenance and Inspection Schedules
Machine Preparation, Inspection, and Maintenance​
3.1.1 General​
3.1.2 Preparation, Inspection, and Maintenance​
3.1.3 Pre-Start Inspection​
3.1.4 Pre-Delivery Inspection and Frequent Inspection​
3.1.5 Annual Machine Inspection​
3.1.6 Preventive Maintenance​
Service and Guidelines​
3.2.1 General​
3.2.2 Safety and Workmanship​
3.2.3 Cleanliness​
3.2.4 Components Removal and Installation​
3.2.5 Component Disassembly and Reassembly​
3.2.6 Pressure-Fit Parts​
3.2.7 Bearings​
3.2.8 Gaskets​
3.2.9 Bolt Usage and Torque Application​
3.2.10 Hydraulic Lines and Electrical Wiring​
3.2.11 Hydraulic System​
3.2.12 Lubrication​
3.2.13 Battery​
3.2.14 Welding on JLG Equipment​
Preventive Maintenance and Inspection Schedule​
3.3.1 Daily​
3.3.2 First 50 Hours​
3.3.3 First 150 Hours​
3.3.4 Every 150 Hours or 3 Months​
3.3.5 First 300 Hours or 6 Months​
3.3.6 Every 500 Hours or 6 Months​
3.3.7 Every 500 Hours or 1 Year​
3.3.8 Every 600 Hours or 1 Year​
3.3.9 Every 1200 Hours or 2 Years​
Pins and Composite Bearing Repair Guidelines​
Fuel Tank Inspection​
Hydraulic Filter Replacement​
Turntable Bearing Inspection​
3.7.1 Turntable Bearing Mounting Bolt Condition Check​
3.7.2 Wear Tolerance​
Engine General Inspection​
3.8.1 Deutz TCD2.9L4/TD2.9L4 Engines​
3.8.2 Engine and Hydraulic Operating Temperature Specifications​
Bio Fuel In Deutz Engines​
3.9.1 General​
3.9.2 Bio Fuel​
3.9.3 Biological Contamination In Fuels​
Deutz EMR5​
Generator Inspection​
3.11.1 Every 250 hours​
3.11.2 Every 500 hours​
3.11.3 Overload Protection​
3.11.4 Inspecting Brushes, Replacing Brushes, and Cleaning Slip Rings​
3.11.5 Troubleshooting​
Testing, Calibrations and Special Procedures
Special Tools​
4.1.1 Multimeter Basics​
4.1.2 Threadlocking Compound​
4.1.3 Tools Catalog​
Testing Procedures​
4.2.1 Starter​
4.2.2 SkyGuard​
4.2.3 LSS Testing and Evaluation​
4.2.4 System Test​
Calibration Procedures​
4.3.1 JLG Analyzer​
4.3.2 Calibration Instructions​
4.3.3 Calibration Preparation​
4.3.4 Load Sensing System Calibration​
4.3.5 Calibrating Platform Level​
4.3.6 Calibrating Tilt Sensor​
4.3.7 Boom Sensor Calibration​
4.3.8 Rotary Angle Sensor Calibration​
4.3.9 Boom Control System (BCS) Violation​
4.3.10 Calibrating Steer​
4.3.11 Calibrating Drive​
4.3.12 Calibrating Boom Valves​
Special Procedures​
4.4.1 Fuel Tank Cleaning and Drying​
4.4.2 Cylinder Drift​
4.4.3 Oscillating Axle Bleeding Procedure and Lockout Test​
4.4.4 Axle Limit Switch Adjustment Procedure​
4.4.5 Tower Boom Drift Test​
4.4.6 Drive Cutout Override Service Mode​
4.4.7 Counterbalance Valve Check​
4.4.8 Air Purge Procedure for Non-Calibrated Machines​
4.4.9 Air Purge Procedure for Calibrated Machines​
System Software
Load Sensing System (LSS)​
5.1.1 Theory of Operation​
5.1.2 Load Sensing Gauge Removal/ Installation​
JLG Analyzer​
5.2.1 Introduction​
5.2.2 Machine Data Access​
5.2.3 Hand Held Analyzer​
5.2.4 Using the Analyzer​
5.2.5 Changing Access Level of Hand Held Analyzer​
5.2.6 Adjusting Parameters Using Hand Held Analyzer​
5.2.7 Machine Setup​
5.2.8 Analyzer Flow Chart​
Analyzer Software Accessibility​
5.3.1 Analyzer Diagnostics​
5.3.2 Machine Set-Up​
5.3.3 Machine Personality Settings and Function Speeds​
Machine Orientation When Setting Speeds​
CANBUS Communications​
5.5.1 CANBUS Connections​
5.5.2 CANBUS Communication Failure​
Service Mode​
5.6.1 Load Sensing System​
5.6.2 Drive Cutout Override​
5.6.3 Axle​
Electronic Platform Leveling​
5.7.1 Description​
5.7.2 Normal Operation​
5.7.3 Platform Leveling Fault Warning​
5.7.4 Fault Response​
5.7.5 CAN Errors​
5.7.6 Additional Platform and Jib Valves​
ClearSky (CS550) Configuration and Troubleshooting​
5.8.1 ClearSky Smart FleetTM CS550 Configuration​
5.8.2 Troubleshooting​
Fault Codes
Fault Codes Introduction​
Engine Diagnostic​
6.2.1 Engine Fault Codes (Deutz)​
6.2.2 Engine Trouble Codes​
Machine Fault Codes​
6.3.1 General​
6.3.2 ClearSky Smart Fleet DTC Fault Codes​
6.3.3 LSS Troubleshooting​
6.3.4 System Test Messages​
Deutz EMR Fault Codes​
6.4.1 Deutz EMR5 Fault Codes​
ClearSky CS550 Troubleshooting Procedures​
Hydraulics
General Information and Safety​
Theories of Operation​
7.2.1 Cylinders​
7.2.2 Valves​
Hydraulic Components​
7.3.1 Hydraulic Tank​
7.3.2 Pressure Setting Procedure​
7.3.3 Drive and Function Pump Start Up​
7.3.4 Rotary Coupling Ports​
Torque Values​
7.4.1 Main Valve Torque Specifications​
Standard Hydraulic Diagram- Boom And Turntable​
7.5.1 Boom​
7.5.2 Turntable (with Rexroth Pump)​
7.5.3 Turntable (with Sauer Pump)​
Hydraulic Diagram - Chassis​
7.6.1 4WD Chassis (with Rexroth Pump)​
7.6.2 4WD Chassis (with Sauer Pump)​
7.6.3 Oscillating Axle​
7.6.4 Axle Extend and Steer​
Electricals
General Information​
8.1.1 Applying Silicone Dielectric Compound to Electrical Connections​
8.1.2 Dielectric Grease Application​
Electrical Connectors​
8.2.1 Deutsch Connectors​
Electrical Component Terminology​
Harness Layouts​
Board Layouts​
8.5.1 Chassis Control Module​
8.5.2 BLAM Control Module​
8.5.3 Ground Control Module​
8.5.4 Platform Control Module​
AMP Connector​
8.6.1 Applying Silicone Dielectric Compound to AMP Connectors​
8.6.2 Assembly​
8.6.3 Disassembly​
8.6.4 Wedge Lock​
8.6.5 Service - Voltage Reading​
Wiring Harness​
Telematics Gateway​
8.8.1 Telematics-Ready (TCU) Plug​
Removal and Installation
Wheel and Tire​
Chassis/Frame Assembly​
9.2.1 Wheel Drive Assembly​
9.2.2 Spindle​
9.2.3 Axle​
Boom​
9.3.1 Boom Switches​
9.3.2 Main Boom Powertrack​
9.3.3 Tower Boom Powertrack​
9.3.4 Tower Boom Installation and Assembly​
9.3.5 Pin Clamp Installation Procedure​
9.3.6 Boom Sensors​
9.3.7 Rotary Angle Sensor​
9.3.8 Jib Assembly​
9.3.9 Rotator​
9.3.10 Hose Routing Procedure​
Platform​
9.4.1 Platform (Rapid Replaceable Platform)​
9.4.2 Platform Support (Traditional Design)​
9.4.3 Platform Support (Rapid Replaceable Platform)​
9.4.4 Bolt-on External Fall Arrest​
Engine​
9.5.1 Component Terminology​
9.5.2 Engine Serial Number​
9.5.3 Engine Replacement​
9.5.4 Surge Tank​
9.5.5 Pump Coupling Kit​
9.5.6 Air Filter Assembly​
9.5.7 Radiator Assembly​
9.5.8 Thermostat​
9.5.9 Coolant Temperature Sensor​
9.5.10 Relay Assembly​
9.5.11 Starter​
9.5.12 Alternator​
9.5.13 Fuel Tank​
9.5.14 Pre-Fuel Filter and Fuel Pump​
Transmission​
Hydraulic Cylinders​
9.7.1 Tower Telescopic Cylinder​
9.7.2 Tower Lift Cylinder​
9.7.3 Main Lift Cylinder​
9.7.4 Main Boom Telescope Cylinder​
9.7.5 Platform Level Cylinder​
9.7.6 Jib Lift Cylinder​
9.7.7 Steer Cylinder​
9.7.8 Axle Extend Cylinder​
9.7.9 Axle Lockout Cylinder​
Hydraulic Valves​
9.8.1 Platform Valve (Traditional Design)​
9.8.2 Platform Valve (Rapid Replaceable)​
9.8.3 Main Control Valve​
9.8.4 Traction Valve​
9.8.5 Axle Extend and Steer Valve​
9.8.6 Enable Valves​
Hydraulic Pumps​
9.9.1 Charge Pump​
9.9.2 Function Pump​
9.9.3 Drive Pump​
9.9.4 Rexroth Pump​
Electrical Components​
9.10.1 Battery​
9.10.2 Cold Weather Package​
Turntable​
9.11.1 Swing Drive Hub​
9.11.2 Swing Brake​
9.11.3 Procedure For Setting Gear Backlash​
9.11.4 Swing Drive Lubrication​
9.11.5 Rotary Coupling​
9.11.6 Swing Bearing​
9.11.7 Counterweight​
Generator Pulley​
9.12.1 Removal​
9.12.2 Installation​
ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)​
9.13.1 ClearSky® LED Motion / Amber Beacon (CS550) (if equipped)​
Disassembly and Assembly
Drive Assembly​
10.1.1 Drive Hub​
Boom and Jib Assembly​
10.2.1 Main Boom​
10.2.2 Tower Boom​
10.2.3 Rotary Actuator​
Pumps​
10.3.1 Drive Pumps​
10.3.2 Function Pump​
Hydraulic Cylinders​
10.4.1 Disassembly​
10.4.2 Cleaning and Inspection​
10.4.3 Assembly​
Turntable​
10.5.1 Swing Drive Hub​
10.5.2 Swing Drive​
10.5.3 Swing Brake​
10.5.4 Rotary Coupling Seal​
Generator Disassembly and Assembly​
Powertrack​
10.7.1 One Piece Bracket Maintenance​
10.7.2 Two Piece Bracket Maintenance​
10.7.3 Snap Rings and Screws​
Torque/Connection Information
Hydraulic Fittings​
11.1.1 Tapered Thread Types​
11.1.2 Straight Thread Types, Tube and Hose Connections​
11.1.3 Straight Thread Types, Port Connections​
11.1.4 Flange Connection Types​
11.1.5 Tightening Methods​
11.1.6 Assembly and Torque Specifications​
11.1.7 General Tube Type Fitting Assembly Instructions​
11.1.8 Assembly Instructions for American Standard Pipe Thread Tapered Connections.​
11.1.9 Assembly Instructions for British Standard Pipe Thread Tapered Connections​
11.1.10 Assembly Instructions for 37° (JIC) Flare Fittings​
11.1.11 Assembly Instructions for 45° SAE Flare Fittings​
11.1.12 Assembly Instructions for O-Ring Face Seal (ORFS) Fittings​
11.1.13 Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)​
11.1.14 Assembly Instructions for Bulkhead (BH) Fittings​
11.1.15 Assembly Instructions for O-Ring Boss (ORB) Fittings​
11.1.16 Assembly Instructions for Adjustable Port End Metric Fittings​
11.1.17 Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Ends​
11.1.18 Assembly instructions for Adjustable Port End (BSPP) Fittings​
11.1.19 Assembly Instructions for Flange Connections: (FL61 and FL62)​
11.1.20 Double Wrench Method​
11.1.21 FFWR and TFFT Methods​
11.1.22 Adjustable Stud End Assembly​
11.1.23 O-ring Installation (Replacement)​
Torque Charts​
11.2.1 SAE Fastener Torque Chart​
11.2.2 Metric Fastener Torque Chart​
Schematics
Hydraulic Schematics​
Electrical Schematics​
Deutz EMR5 Schematics​
Generator Schematic​




 
Top