JLG Boom Lift 1230ES Service & Maintenance Manual 3121222 2025
- Download this document, you need 2725 Gallons
JLG Boom Lift 1230ES Service & Maintenance Manual 3121222 2025
Size: 12.10 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1230ES Boom Lift
Serial Number:
0130000001 to Present
0200000001 to Present
1200000001 to Present
A200006116 to Present
M130000001-M130008778
Part Number: 3121222
Publication Date: 2025
Number of Pages: 206 Pages
Contents:
Section A. Introduction - Maintenance Safety Precautions
Size: 12.10 MB
Format: PDF
Language: English
Brand: JLG
Type of Machine: Boom Lift
Type of Manual: Service & Maintenance Manual, Electrical and Hydraulic Diagrams
Model: JLG 1230ES Boom Lift
Serial Number:
0130000001 to Present
0200000001 to Present
1200000001 to Present
A200006116 to Present
M130000001-M130008778
Part Number: 3121222
Publication Date: 2025
Number of Pages: 206 Pages
Contents:
Section A. Introduction - Maintenance Safety Precautions
General
Hydraulic System Safety
Maintenance
Section 1. MACHINE SPECIFICATIONS1.1 OPERATING SPECIFICATIONS
Platform Capacities
Dimensional Data
Tires
Batteries
Critical Stability Weights
1.2 LUBRICATION
Lubrication Capacities
Hydraulic Oil
Lubrication Specifications
Hydraulic Oil Specifications
Oil Check Procedure
1.3 CYLINDER SPECIFICATIONS
1.4 TORQUE REQUIREMENTS
1.5 SERIAL NUMBER LOCATIONS
Section 2. GENERAL SERVICE INFORMATION2.1 MACHINE PREPARATION, INSPECTION, AND MAINTENANCE
General
Preparation, Inspection, and Maintenance
Pre-Start Inspection
Pre-Delivery Inspection and Frequent Inspection
Annual Machine Inspection
Preventative Maintenance
2.2 PREVENTIVE MAINTENANCE AND INSPECTION SCHEDULE
2.3 SERVICING AND MAINTENANCE GUIDELINES
General
Safety and Workmanship
Cleanliness
Components Removal and Installation
Component Disassembly and Reassembly
Pressure-Fit Parts
Bearings
Gaskets
Bolt Usage and Torque Application
Hydraulic Lines and Electrical Wiring
Hydraulic System
Lubrication and Servicing
Batteries
2.4 LUBRICATION INFORMATION
Hydraulic System
Lubrication Specifications
Hydraulic Oil
Changing Hydraulic Oil
Section 3. THEORY OF OPERATION - 1230ES3.1 OVERVIEW
3.2 MODES OF OPERATION
Ground Mode
Platform mode
3.3 CAN COMMUNICATIONS
3.4 CONTROLS & SENSORS
Elevation
Joystick
Tilt
3.5 TRACTION
Personalities
Interlocks
3.6 PUMP/LIFT/MAST
Personalities
Interlocks
3.7 STEER
Personalities
Interlocks
Section 4. BASE COMPONENTS4.1 BASE ASSEMBLY COMPONENTS
1. Hydraulic Pump/Tank/Valve Assy.
2. Steering Linkage Assembly
3. Drive Motor/Spindle Assemblies
4. Pot Hole Protection Assembly
5. Static Strap
6. Steer Cylinder Assembly
7. Left Side (Battery Tray) Door
8. Right Side (Battery Tray) Door
9. Rear Wheel Assembly
4.2 BASE FRAME COVERS
Base Top Cover - Installation
Step Plate/Battery Charger Cover - Installation
Battery Tray/Side Door - Installation
4.3 WHEELS AND TIRES - DRIVE AND REAR
Tire Wear and Damage
Wheel and Tire Replacement
Wheel Installation
4.4 REAR WHEEL HUB - INSTALLATION
1. Hub Cap
2. Cotter Pin
3. Spindle Nut
4. Washer
5. Outer Tapered Roller Bearing (a)
6. Outer Bearing Race (a)
7. Wheel Mounting Hub (a)
8. Inner Bearing Race (a)
9. Inner Tapered Roller Bearing (a)
10. Hub Seal
4.5 STEERING LINKAGE ASSEMBLY - INSTALLATION
1. Left Steering Knuckle Lug
2. Left Steering Arm Link
3. Right Steering Arm Link
4. Right Steering Knuckle Lug
5. Steering Cross Link
6. Hydraulic Steer Cylinder
7. Steer Cylinder Anchor Pin
8. Cross Link Anchor Pin
9. Steer Cylinder - Steer Right Port
10. Steer Cylinder - Steer Left Port
11. King Pin
12. Steering Knuckle Stop
4.6 STEER CYLINDER - SERVICING
1. Rod End Bushing
2. Cylinder Head (Gland) (a)
3. O’Ring Seal
4. Backing Ring
5. O’Ring Seal
6. Cylinder Rod
7. Piston (b)
8. Piston Seal
9. Bushing
10. Piston Set Screw
11. Main Gland Seal
12. Wiper Seal
13. O’Ring Seal
Steer Cylinder Disassembly
Hydraulic Cylinder Component Inspection
Steer Cylinder - Assembly
4.7 DRIVE MOTOR/SPINDLE ASSEMBLY - INSTALLATION
1. DriveMotor/Spindle Assembly
2. 60mm External Retaining Ring
3. Spindle Retaining Washer
4. Knuckle Lug Attach Screws (a)
5. 60mm Thrush Washer
6. King Pin (welded to frame) (b)
7. Steering Knuckle Lug
8. Drive Motor Power Harness (c)
4.8 WHEEL DRIVE ASSEMBLY - SERVICING
Drive Motor Electrical Evaluation
Roll And Leak Testing
Oil Type & Capacity
Drive Motor Power Harness Routing
Wheel Drive Brake - Manual Disengage Procedure
Wheel Drive Motor Assembly - Removal From Machine
Drive Motor Disassembly
Drive Motor Inspection and Servicing
Drive Motor - Reassembly
Main Gear Box Disassembly
Input Carrier Disassembly
Hub - Disassembly
Spindle Disassembly
Spindle Sub-Assembly
Hub Sub-Assembly
Input Carrier Sub-Assembly
Main Gear Box Sub-Assembly
Motor Assembly
4.9 HYDRAULIC PUMP/MOTOR/VALVE ASSEMBLY - SERVICE PROCEDURE
Common Difficulties
Pump Components
Hydraulic System Pressure Check Port
Hydraulic System Pressure Settings
Pump/Motor/Valve Assembly - Removal/Installation
Motor Cover/Motor Installation
Preventative Maintenance - Brush Wear - Dust Removal Procedure
Motor Brush Installation
4.10 POT HOLE PROTECTION SYSTEM
1. PHP Actuator (Platform)
2. Right/Left PHP Limit Switch
3. Right Side Counterbalance Link
4. Left Side Counterbalance Link
5. PHP Link Plate
6. Right PHP Bar
7. Left PHP Bar
8. Spacer Tube and Torsion Springs
1. Actuator Attach Screws/Nuts
2. PHP Actuator Assembly
3. Limit Switch (a)
4. Limit Switch Mounting Block (b)
5. Limit Switch Attach Screws
6. Torsion Spring (c)
7. Tube Spacer
8. Counterbalance Link Mounting Pin
9. Pin Retaining Ring
10. Left Side Countbalance Link
1. Actuator Attach Screws/Nuts
2. PHP Actuator Assembly
3. Limit Switch (a)
4. Limit Switch Mounting Bracket (b)
5. Limit Switch Attach Screws
6. Torsion Spring (c)
7. Tube Spacer
8. Counterbalance Link Mounting Pin
9. Pin Retaining Ring
10. Left Side Countbalance Link
Section 5. CONTROL COMPONENTS5.1 CONTROL COMPONENTS OVERVIEW
1. Platform Control Station
2. Ground Control Station
3. Manual Brake Release Switch
4. Battery Charger or Inverter/Charger
5. Warning Beacon
6. Right Side Batteries
7. Ground Alarm
8. Power Module
9. Main Contactor Power Relay
10. Elevation Cut-Back Sensor
11. Left Side Batteries
5.2 CONTROL COMPONENTS - SERVICE
Main Power Contactor Relay
Elevation Limit Switch
Ground Alarm
Warning Beacon - Frame Mounted
Manual Brake Release Switch
AC Power - Breaker Box Installation (CE Specification Machines ONLY)
5.3 TRACTION SYSTEM
Common Traction System Difficulties
5.4 POWER MODULE - P/N-1600346
1. Power Module
2. Mounting Screws
Removal
Installation
Power Module Electrical Evaluation
Power Module Diagnostics
5.5 Power Module - P/N-1001092456
ZAPI Power Module Electrical Evaluation
5.6 GROUND CONTROL MODULE - SERVICE PROCEDURE
Ground Control Station
Printed Circuit Board (PCB) Replacement
5.7 PLATFORM CONTROL STATION - SERVICE INFORMATION
Platform Control Station Assembly
Upper Control Box - Component Replacement
Lower Control Box - Component Replacement
5.8 Battery/Battery Charger
Battery Maintenance and Safety Practices
Battery Installation
5.9 BATTERY CHARGER - INSTALLATION
1. Battery Charger Assembly
2. Attach Screws/Washers
3. AC Voltage - Input Cable
4. LED/Power/Interlock Cables
1. Charger Interlock Cable
2. DC Power Cable to Batteries
3. LED Indicator, Battery Temp. Sensor Cable
1. Charger Interlock Cable
2. DC Power Cable to Batteries
3. LED Indicator, Battery Temp. Sensor Cable
4. IEC End
Battery Charger Troubleshooting
5.10 BATTERY CHARGER/INVERTER (OPTION) - INSTALLATION
1. Charger/Inverter Assembly
2. Insulate Mounting Pad
3. Attach Screws (a)
4. Nylon Shoulder Washers
1. AC Output Connector
2. AC Input Connector
3. Remote On/Off Switch Cable
4. External DC Fuse Location
5. DC (–) Connection
6. DC (+) Connection
Section 6. MAST COMPONENTS6.1 MAST COMPONENTS OVERVIEW
6.2 PLATFORM TOOL TRAY - INSTALLATION
6.3 MAST COVER PLATE - INSTALLATION
6.4 PLATFORM AC RECEPTACLE BOX - INSTALLATION
6.5 MAST ASSEMBLY - COMPONENTS
1. Platform/Outer Mast Section
2. Outer Mid Mast Section
3. Inner Mid Mast Section
4. Mount/Inner Mast Section
5. Hydraulic Cylinder #1
6. Hydraulic Cylinder #2
7. Hydraulic Cylinder #3
8. Top (External) Slide Pads
9. Power-Trak System
10. Power-Trak Guide
11. Power-Trak Shield Assy
12. Bottom (Internal) Slide Pads
1. Front of Machine
2. Rear of Machine
3. Platform/Outer Mast Section
4. Outer Mid Mast Section
5. Inner Mid Mast Section
6. Mount/Inner Mast Section
7. Hydraulic Cylinder Compartment
8. Power-Trak Compartment
9. Cylinder #1 Bleeder Valve
10. Cylinder #2 Bleeder Valve
11. Cylinder #3 Bleeder Valve
12. Corner Slide Pads (a)
6.6 PLATFORM ASSEMBLY
Platform - Extending Mast Unpowered
Platform Removal
Platform Installation
6.7 MAST ASSEMBLY
1. Mast Assembly
2. Fastening Hardware
Mast Removal
Mast Disassembly
Mast - Reassembly
Mast Installation
Multi-Stage Hydraulic Cylinder - Cylinder Bleeding Procedure
Mast Installation Completion
6.8 MULTI-STAGE HYDRAULIC CYLINDER - SERVICING
Overview
Hydraulic Cylinder - Disassembly
Hydraulic Cylinder Component Inspection
Hydraulic Cylinder - Assembly
Hydraulic Cylinder Assembly Testing
Section 7. JLG CONTROL SYSTEM7.1 ELECTRONIC CONTROL SYSTEM
To Connect the Hand Held Analyzer:
Using the Analyzer:
Changing the Access Level of the Hand Held Analyzer:
Machine Setup
Diagnostic Trouble Codes (DTC)
7.2 MACHINE CONFIGURATION PROGRAMMING INFORMATION
7.3 MACHINE PERSONALITY - ADJUSTMENT SETTINGS
7.4 TILT SENSOR CALIBRATION
Ground Module Software Version 1.5
Ground Module Software Version 1.4
Calibration Failures
7.5 TILT SENSOR ELECTRICAL EVALUATION
7.6 ELEVATION ANGLE SENSOR ELECTRICAL EVALUATION
Tilt vs. Allowed Height Evaluation
7.7 ELEVATION SENSOR CALIBRATION
Section 8. DIAGNOSTIC TROUBLE CODES8.1 Introduction
8.2 X-CONNECTOR REFERENCES
8.3 DTC Index
8.4 DTC Check Tables
0-0 Help Comments
2-1 Power-Up
2-2 Platform Controls
2-3 Ground Controls
2-5 Function Prevented
3-1 Line Contactor Open Circuit
3-2 Line Contactor Short Circuit
3-3 Ground Output Driver
4-2 Thermal Limit (SOA)
4-4 Battery Supply
6-6 Communication
6-7 Accessory
7-7 Electric Motor
8-1 Tilt Sensor
8-2 Platform Load Sense
9-9 Hardware
Section 9. GENERAL ELECTRICAL INFORMATION & SCHEMATICS9.1 GENERAL
9.2 MULTIMETER BASICS
Grounding
Backprobing
Min/Max
Polarity
Scale
Continuity Measurement Over Long Distances
Requirements:
Procedure
9.3 ELECTRICAL SWITCH TESTING
Basic Check
Limit Switches
Automatic Switches
Switch Wiring - Low Side, High Side
9.4 APPLYING SILICONE DIELECTRIC COMPOUND TO AMP CONNECTORS
Assembly
Disassembly
Wedge Lock
Service - Voltage Reading
9.5 WORKING WITH DEUTSCH CONNECTORS
DT/DTP Series Assembly
DT/DTP Series Disassembly
HD30/HDP20 Series Assembly
HD30/HDP20 Series Disassembly
9.6 X-CONNECTOR REFERENCES
9.7 CONNECTOR LOADING DIAGRAMS
9.8 X-CONNECTOR ID INDEX
9.9 MACHINE LOCATION OF COMPONENT X-CONNECTORS
9.10 ELECTRICAL LAYOUT AND SCHEMATICS
9.11 Electrical Schematics
9.12 PIN INPUT/OUTPUT TYPES
9.12 AC POWER RECEPTACLES AND WIRING (PLATFORM) - CE SPEC MACHINES ONLY
9.13 HYDRAULIC SCHEMATIC
More the random threads same category:
- Skytrak (JLG) Telehandlers Parts Manual
- SuperPac Parts Manual
- StratoLift Parts Manual
- JLG Toucan Duo 13MSPT Operators Service & Parts Manuals
- JLG Telehandler 1055 1255 (PVC 1911) Operation, Service & Parts Manuals
- JLG Scissor Lift RS Series Operation, Service & Parts Manuals
- JLG Telehandler G10-55A G12-55A Operation, Service & Parts Manuals
- JLG Telehandler 4017 Operation, Service & Parts Manuals
- JLG Telehandler 742 (PVC 1911) Operation, Service & Parts Manuals
- JLG Telehandler 3614RS 4017RS Operation, Service & Parts Manuals
- JLG UTV 315G Operator, Service & Parts Manuals
- JLG SkyTrak TeleHandler MMV Operation, Service & Parts Manuals
- JLG Scissor Lift R6 R10 Operation, Service & Parts Manuals
- JLG-Deutz Fahr Agrovector 40.8 40.9 Operators Service & Parts Manuals
- JLG Telehandler 925, 832 (PVC 1911) Operation, Service & Parts Manuals