Hyundai

Sub-Man
Joined
Likes
86
Gallons
176,684

Hutte Drill Rig HBR 203 Hydraulic Diagrams and Operation Manual

#1
Download this document, you need 1605 Gallons
Download Now
Hutte Drill Rig HBR 203 Hydraulic Diagrams and Operation Manual
Size: 4.23 MB
Format: PDF
Language: English
Brand: Hutte
Type of Machine: Drill Rig
Type of Manual: Operation and Maintenance Manual, Hydraulic Diagram
Model: Hutte HBR 203 Drill Rig
DEUTZ BF 6L 914 C Diesel Engine
Serial Number: H203ZC0100
Year of Construction: 2005
Number of Pages: 152 Pages

Contents:
FOREWORD
TECHNICAL FEATURES
Nomenclature of main components of drilling rig​
Dimension​
Basic machine​
Propulsion unit​
Mast​
Rotary head​
Clamps​
Casagrande rotary head accessories​
Winch​
Stabilizers​
Accumulators precharge​
Tightening torque data​
U
USE OF THE MACHINE – STABILITY CONDITIONS
Field of application
Drilling systems
Handling – Stability conditions
Operator positions
C
COMMANDS AND CONTROLS
Main operational control panel (A)​
Start/stop and diesel engine panel (B)​
Travel control panel (C)​
Machine (HYDRAULIC POWER PACK) (D)​
OPERATION
Start-up​
Travel​
Positioning​
Operations​
Stopping​
MAINTENANCE
Foreword​
Routine machine maintenance​
Routine maintenance of head (T1600 and T1000-6V) + accessories (Casagrande)​
Routine maintenance of head (HG11-HG12-HG19-HG24-HH40/12-HH80/19) + accessories (Hütte)​
TRANSPORT
Hoisting​
Anchoring the machine to the trailer​
DISUSE AND STORAGE OF EQUIPMENT
A
ASSEMBLY / DISASSEMBLY
Ropes​
Flexible hoses​
T1000-6V Head seal rings (Casagrande)​
T1600 head seal rings (Casagrande)​
HG11-HG12-HG19-HH40/12-HH80/19 head seal rings (Hütte)​
Mast chain (hydraulic cylinder)​
Rotary head cylinder​
Crawler chain​
Adjustment of the mast safety system​
DISPOSAL OF THE MACHINE
HYDRAULIC/ELECTRICAL DIAGRAMS
F2 ING.pdf
HBR 203​
DRILLING RIG​
Serial numbers of the main components​
GENERAL INFORMATION​





 
Top